WELL · 42-503-35722 · DISTRICT 9

Killian #2

Plugged

Young County · Young County Regular field  · Vertical

Killian #2 (API 42-503-35722) is a plugged well in Young County, plugged September 28, 1995, last operated by 3-C.

The RRC has issued 2 drilling permits between 1982 and 1983, permitted to 1,000 ft.

It was permitted by Leberman, W. C. Etal and has since transferred to 3-C on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Its 2 leases have reported 8.53K barrels of oil and 19 mcf of gas since January 1993, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.

Operator of record

3-C

Permitted by Leberman, W. C. Etal; the EWA schedule now lists a different operator.

Olney, TX · P-5 Y, filed Mar 1, 2002 · 23 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedule3-C
Production reportsIckert Enterprisesthrough Apr 2026
Latest permitLeberman, W. C. EtalNov 22, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,000
total depth, ft
2
permits on file
Nov 22, 1983
last permit issued
May 8, 1985
completed
8.53K
cumulative oil, bbl
19
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 8, 1985
Shut in
—
Plugged
Sep 28, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Killian O-13-19930Young County RegularIckert Enterprises68.53K19Jan 1993 – Jul 2026
— O-13-23890——000—

Oil, barrels lease total

Last 12 months 83 · prior 12 45(+84%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 13-CJan 1993 → Apr 2002
  2. 2Cooper OperatingMay 2002 → Apr 2004
  3. 3Occidental Energy Company, Inc.May 2004 → Sep 2006
  4. 4Axis Energy CorporationOct 2006 → Dec 2006
  5. 5Ickert EnterprisesJan 2007 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
221378-99OtherLeberman, W. C. EtalNov 16, 1983Nov 22, 1983Nov 23, 19831,000
150644-99DrillBair-Lee Oil Co., Inc.Feb 12, 1982Feb 12, 1982—1,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-19930————
—— O-13-23890————

Formation tops

As filed on W-2/G-1. Subsea from 1,205 ft elevation.Download CSV →

FormationMD ftSubsea
Gunsight11,204

Perforations

Perforated and open-hole intervals.

FromToType
766776Perforated
950960Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.59587.875350 S
4.51,0007.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 4, 1985Aug 2, 1985—
00Aug 18, 1985——
00Jan 12, 1984Aug 10, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.82K
bbl, last 12 reported months
17K
bbl, all reported
Nov 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000056093H-1 InjectionPlugged Oct 2, 199500950–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,820 · prior 12 3,650(-50%)

020040019941995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50335722, documented in the API reference.