WELL · 42-503-36371 · DISTRICT 9

Boydston Don #1

Plugged

Young County · Jean NW. (Caddo) field  · Vertical

Boydston Don #1 (API 42-503-36371) is a plugged well in Young County, plugged January 7, 1987, last operated by Hays & Boydston.

The RRC has issued one drilling permit, issued October 15, 1982, permitted to 4,800 ft.

It was permitted by Railhead Energy Company and has since transferred to Hays & Boydston on the wellbore schedule.

Operator of record

Hays & Boydston

Permitted by Railhead Energy Company; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Feb 4, 1994 · 33 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHays & Boydston
Production reportsnone
Latest permitRailhead Energy CompanyOct 15, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,800
total depth, ft
1
permits on file
Oct 15, 1982
last permit issued
Mar 3, 1983
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 3, 1983
Shut in
—
Plugged
Jan 7, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
174461-99DrillRailhead Energy CompanyOct 15, 1982Oct 15, 1982—4,800

Perforations

Perforated and open-hole intervals.

FromToType
4,4424,452Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62579712.25530 S
2.3754,423——
4.54,6097.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Mar 10, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50336371, documented in the API reference.