WELL · 42-503-37177 · DISTRICT 7
E.A. Haggard #1
Young County · Young County Regular field · Vertical
E.A. Haggard #1 (API 42-503-37177) is a plugged well in Young County, plugged August 7, 1987, last operated by Ashtola Exploration Company Inc..
The RRC has issued 2 drilling permits between 1983 and 1984, permitted to 4,518 ft.
Completion filings report 2 formation tops, including Palo Pinto, Caddo.
Operator of record
Ashtola Exploration Company Inc.
Amarillo, TX · P-5 Y, filed Oct 4, 2025 · 362 permits on file · (406) 446-1484
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ashtola Exploration Company Inc. |
| Production reports | none |
| Latest permit | Ashtola Exploration Company,inc.Sep 18, 1984 |
- 4,518
- total depth, ft
- 2
- permits on file
- Sep 18, 1984
- last permit issued
- May 30, 1984
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 30, 1984
- Shut in
- —
- Plugged
- Aug 7, 1987
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 251809-99 | Recompletion | Ashtola Exploration Company,inc. | Sep 17, 1984 | Sep 18, 1984 | — | 3,200 |
| 202457-99 | Drill | N. E. Operating Co., Inc. | Aug 10, 1984 | Jul 21, 1983 | — | 4,518 |
Formation tops
As filed on W-2/G-1. Subsea from 1,220 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo PintoPALO PINTO LIME | 1,336 | -116 |
| Palo PintoPALO PINTO LM | 1,336 | -116 |
| Caddo | 3,913 | -2,693 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,119 | 3,121 | Perforated |
| 3,119 | 3,151 | Perforated |
| 3,149 | 3,151 | Perforated |
| 4,429 | 4,434 | Perforated |
| 4,444 | 4,448 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 215 | 12.25 | 150 S |
| 4.5 | 4,518 | 7.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 24, 1985 | Oct 9, 1985 | — |
| 00 | Dec 3, 1984 | Oct 22, 1984 | — |
| 00 | Nov 13, 1984 | — | — |
| 00 | Aug 17, 1984 | Aug 3, 1984 | — |
| 00 | Aug 15, 1984 | Aug 3, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-37177 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-37177 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000057607 | H-1 Injection | Plugged Aug 27, 1987 | 0 | 0 | 3,119–0 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50337177, documented in the API reference.