WELL · 42-503-37416 · DISTRICT 9

Nantz J. H. #4C

N

Young County · Young County Regular field  · Vertical

Nantz J. H. #4C (API 42-503-37416) is a well in Young County operated by North Texas Plugging LLC, completed October 20, 1983.

The RRC has issued 2 drilling permits between 1983 and 1990, permitted to 4,500 ft.

It was permitted by Martin Petroleum Corp. and has since transferred to North Texas Plugging LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Palo Pinto, Caddo, Marble Falls, Barnett.

Its 2 leases have reported 36.7K barrels of oil and 59.9K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

North Texas Plugging LLC

Permitted by Martin Petroleum Corp.; the EWA schedule now lists a different operator.

Denton, TX · P-5 Y, filed Jul 4, 2026 · (214) 407-4525

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNorth Texas Plugging LLC
Production reportsBorderline Operating Corp.through Jun 2020
Latest permitMartin Petroleum Corp.Jul 18, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,500
total depth, ft
2
permits on file
Jul 18, 1990
last permit issued
Oct 20, 1983
completed
36.7K
cumulative oil, bbl
59.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 20, 1983
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nantz G-13-135704Gilmac (Congl)North Texas Plugging, LLC1021.1KJan 1993 – Jul 2026
Nantz O-13-24670Grimes (Miss.)North Texas Plugging, LLC136.7K38.8KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Martin Petroleum Corp.Jan 1993 → Mar 2020
  2. 2Borderline Operating Corp.May 2020 → Jun 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
375273-99RecompletionMartin Petroleum Corp.Jul 9, 1990Jul 18, 1990—4,488
209160-99DrillStreet, E. Bruce, Jr.Jun 25, 1984Sep 1, 1983Sep 28, 19834,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-135704————
—— O-13-24670————

Formation tops

As filed on W-2/G-1. Subsea from 1,098 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto736362
Caddo3,455-2,357
Marble FallsMARBLE FALLS LIME4,132-3,034
BarnettBARNETT SHALE4,380-3,282
MississippianMISSISSIPPI LIME4,426-3,328

Perforations

Perforated and open-hole intervals.

FromToType
4,0464,061Perforated
4,4884,497Open hole
—4,497Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520112.25115 S
5.54,4887.875250 S
2.3754,497——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 3, 1990Jul 6, 1990Yes
00Oct 8, 1990——
00Oct 23, 1984Jun 26, 1984—
00Oct 3, 1984——
00Jan 12, 1984Oct 26, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50337416, documented in the API reference.