WELL · 42-503-37911 · DISTRICT 9
Cadenhead #1
Young County · Vertical
Cadenhead #1 (API 42-503-37911) is a plugged well in Young County, plugged April 24, 1984, last operated by Three P Operating Company.
The RRC has issued 2 drilling permits between 1984 and 1985, permitted to 5,000 ft.
Completion filings report 2 formation tops, including Gunsight, Caddo.
Its lease has reported 193K barrels of oil and 16.2K mcf of gas since January 1993, last reporting in July 2026. The lease carries 15 wells, so these are lease totals, not this well alone.
Operator of record
Newcastle, TX · P-5 Y, filed Oct 3, 2008 · 130 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Three P Operating Co.,gp, L.L.C.through Jun 2022 |
| Latest permit | Three P Operating CompanyDec 2, 1985 |
- 5,000
- total depth, ft
- 2
- permits on file
- Dec 2, 1985
- last permit issued
- —
- completed
- 193K
- cumulative oil, bbl
- 16.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Apr 24, 1984
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 15 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Clns Unit O-13-26344 | Young County Regular | Lex and Lace Petroleum, LLC | 15 | 193K | 16.2K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Three P Operating CompanyJan 1993 → Nov 2007
- 2Three P Operating Co.,gp, L.L.C.Dec 2007 → Jun 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 292012-99 | Other | Three P Operating Company | Nov 27, 1985 | Dec 2, 1985 | — | 4,150 |
| 227656-99 | Drill | Calumet Corp. | Jan 16, 1984 | Jan 25, 1984 | Apr 23, 1984 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-26344 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,208 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,059 | 4,061 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 312 | 12.25 | 200 S |
| 4.5 | 4,230 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 27, 1987 | Dec 31, 1986 | Yes |
| 00 | Jan 22, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-37911 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-37911 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Nov 1996
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000066489 | H-1 Injection | Plugged May 1, 1997 | 4,000 | 1,900 | 4,000–4,060 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50337911, documented in the API reference.