WELL · 42-503-37943 · DISTRICT 9
Pringle #1
Young County · Young County Regular field · Vertical
Pringle #1 (API 42-503-37943) is a plugged well in Young County, plugged September 13, 2016, last operated by First Texas Energy Expl. Inc..
The RRC has issued one drilling permit, issued February 17, 1984, permitted to 5,200 ft.
It was permitted by Bennett & Guinn, Inc and has since transferred to First Texas Energy Expl. Inc. on the wellbore schedule.
Completion filings report one formation top, including Mississippian.
Operator of record
Permitted by Bennett & Guinn, Inc; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Mar 4, 2017 · 18 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | First Texas Energy Expl. Inc. |
| Production reports | none |
| Latest permit | Bennett & Guinn, IncFeb 17, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,200
- total depth, ft
- 1
- permits on file
- Feb 17, 1984
- last permit issued
- Mar 18, 1984
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 18, 1984
- Shut in
- —
- Plugged
- Sep 13, 2016
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pringle O-13-24282 | Young County Regular | First Texas Energy Expl. Inc. | 2 | 0 | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 229848-99 | Drill | Bennett & Guinn, Inc | Feb 17, 1984 | Feb 17, 1984 | — | 5,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-24282 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,213 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| MississippianMISSISSIPPI | 4,945 | -3,732 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,948 | 4,956 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 381 | 12.25 | 200 sx |
| 4.5 | 4,988 | 7.875 | 150 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 14, 1984 | May 15, 1984 | — |
| 00 | May 25, 1984 | May 15, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-37943 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-37943 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000102355 | W-14 Disposal | Plugged Sep 13, 2016 | 250 | 700 | 2,174–2,194 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50337943, documented in the API reference.