WELL · 42-503-38415 · DISTRICT 9
Watson Unit #1
Young County · Young County Regular field · Vertical
Watson Unit #1 (API 42-503-38415) is a plugged well in Young County, plugged July 19, 1991, last operated by Clover Oil & Gas Inc..
The RRC has issued 2 drilling permits (amended once) between 1984 and 1990, permitted to 4,990 ft.
Completion filings report 5 formation tops, including Top Mclester Sand, Caddo, Marble Falls, Barnett.
Operator of record
Richardson, TX · P-5 Y, filed Jul 4, 2026 · 27 permits on file · (214) 763-5206
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Clover Oil & Gas Inc. |
| Production reports | none |
| Latest permit | Clover Oil & Gas, Inc.Jun 1, 1990 |
- 4,990
- total depth, ft
- 3
- permits on file
- Jun 1, 1990
- last permit issued
- Nov 6, 1990
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 6, 1990
- Shut in
- —
- Plugged
- Jul 19, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Watson Unit O-13-24895 | Proffitt (Miss.) | Clover Oil & Gas, Inc. | 1 | 0 | 0 | Jan 1993 – Aug 2003 |
| — O-13-28009 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 373101-98 | Recompletion | Clover Oil & Gas, Inc. | Mar 18, 1991 | Jun 1, 1990 | Jul 24, 1990 | 4,555 |
| 373101-99 | Recompletion | Clover Oil & Gas, Inc. | May 9, 1990 | Jun 1, 1990 | — | 4,555 |
| 254336-99 | Drill | Canusa Energy, Inc. | Oct 12, 1984 | Oct 12, 1984 | — | 4,990 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-24895 | — | — | — | — |
| — | — O-13-28009 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,128 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Top McLester Sand | 4,000 | -2,872 |
| CaddoCADDO LIMESTONE | 4,119 | -2,991 |
| Caddo | 4,120 | -2,992 |
| CaddoCADDO CONGLOMERATE | 4,152 | -3,024 |
| Marble Falls | 4,353 | -3,225 |
| BarnettBARNETT SHALE | 4,503 | -3,375 |
| Mississippian | 4,522 | -3,394 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,153 | 4,159 | Perforated |
| 4,529 | 4,555 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 235 | 11 | 115 S |
| 8.625 | 235 | — | — |
| 5.5 | 4,529 | 7.875 | 240 S |
| 5.5 | 4,529 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 18, 1991 | Dec 27, 1990 | Yes |
| 00 | May 1, 1991 | — | — |
| 00 | Jan 11, 1985 | Dec 3, 1984 | — |
| 00 | Dec 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-38415 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-38415 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50338415, documented in the API reference.