WELL · 42-503-38504 · DISTRICT 9
Rhodes #2
Young County · Young County Regular (Gas) field · Vertical
Rhodes #2 (API 42-503-38504) is a plugged well in Young County, plugged November 30, 1990, last operated by Bruce & Creighton.
The RRC has issued one drilling permit, issued November 27, 1984, permitted to 4,969 ft.
It was permitted by Consolidated Energy Group and has since transferred to Bruce & Creighton on the wellbore schedule.
Completion filings report 3 formation tops, including Strawn, Caddo, Mississippian.
Operator of record
Permitted by Consolidated Energy Group; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Nov 9, 2001 · 6 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bruce & Creighton |
| Production reports | none |
| Latest permit | Consolidated Energy GroupNov 27, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,969
- total depth, ft
- 1
- permits on file
- Nov 27, 1984
- last permit issued
- Dec 22, 1984
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 22, 1984
- Shut in
- —
- Plugged
- Nov 30, 1990
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-13-118322 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 259525-99 | Drill | Consolidated Energy Group | Aug 23, 1985 | Nov 27, 1984 | Nov 21, 1984 | 4,969 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-118322 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,084 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 3,296 | -2,212 |
| Caddo | 3,620 | -2,536 |
| CaddoMIDDLE CADDO | 3,670 | -2,586 |
| MississippianMISSISSIPPI | 4,450 | -3,366 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,600 | 2,620 | Perforated |
| 4,075 | 4,079 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 160 | 12.25 | 115 S |
| 4.5 | 4,132 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 10, 1989 | Aug 11, 1989 | — |
| 00 | Oct 14, 1985 | Aug 7, 1985 | — |
| 00 | Oct 11, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-38504 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-38504 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Oct 1990
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000071615 | W-14 Disposal | Plugged Jan 14, 1991 | 1,200 | 1,200 | 2,600–2,620 |
MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50338504, documented in the API reference.