WELL · 42-503-38606 · DISTRICT 9

Campbell D #6

Y

Young County · Young County Regular field · Injection  · Vertical

Campbell D #6 (API 42-503-38606) is a well in Young County operated by Craig Robert A., completed September 5, 1985 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued February 5, 1985, permitted to 1,200 ft.

It was permitted by Craig, Bob and has since transferred to Craig Robert A. on the wellbore schedule.

Completion filings report 2 formation tops, including Gunsight, Oil Sand.

Its lease has reported 11.8K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 18.1K barrels injected in the 12 months reported through November 2025.

Operator of record

Craig Robert A.

Permitted by Craig, Bob; the EWA schedule now lists a different operator.

Olney, TX · P-5 Y, filed Oct 4, 2025 · (940) 564-6912

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCraig Robert A.
Production reportsCraig, Robert A.through Apr 2026
Latest permitCraig, BobFeb 5, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,200
total depth, ft
1
permits on file
Feb 5, 1985
last permit issued
Sep 5, 1985
completed
11.8K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 5, 1985
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Campbell D O-13-25509Young County RegularCraig, Robert A.711.8K21Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 22 · prior 12 43(-49%)

0246202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Craig, BobJan 1993 → Apr 1998
  2. 2Craig, CarlMay 1998 → Sep 2001
  3. 3Craig, Robert A.Feb 2002 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
266210-99DrillCraig, BobFeb 4, 1985Feb 5, 1985—1,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-25509————

Formation tops

As filed on W-2/G-1. Subsea from 1,210 ft elevation.Download CSV →

FormationMD ftSubsea
GunsightGUNSIGHT LIME955255
Oil Sand971239

Perforations

Perforated and open-hole intervals.

FromToType
971975Perforated
975971Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,0246.75180 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 13, 2021Nov 10, 2021—
00Feb 6, 1986Jan 23, 1986—
00Oct 3, 1985Sep 10, 1985Yes
00Sep 25, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

18.1K
bbl, last 12 reported months
1.67M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000058500H-1 InjectionActive350450971–975

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 18,115 · prior 12 18,525(-2%)

01K2K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50338606, documented in the API reference.