WELL · 42-503-39015 · DISTRICT 9

Crouch E. C. #4

Plugged

Young County · Young County Regular field  · Vertical

Crouch E. C. #4 (API 42-503-39015) is a plugged well in Young County, plugged December 5, 1986, last operated by Casteel Michael Hoyt.

The RRC has issued one drilling permit, issued October 16, 1985, permitted to 550 ft.

Completion filings report one formation top, including Tannehill.

Operator of record

Casteel Michael Hoyt

Graham, TX · P-5 Y, filed Dec 6, 1996 · 26 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCasteel Michael Hoyt
Production reportsnone
Latest permitCasteel, Michael HoytOct 16, 1985
550
total depth, ft
1
permits on file
Oct 16, 1985
last permit issued
Feb 18, 1986
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 18, 1986
Shut in
—
Plugged
Dec 5, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
288066-99DrillCasteel, Michael HoytOct 15, 1985Oct 16, 1985—550

Formation tops

As filed on W-2/G-1. Subsea from 1,110 ft elevation.Download CSV →

FormationMD ftSubsea
Tannehill517593

Perforations

Perforated and open-hole intervals.

FromToType
520—Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.55206.7585 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 17, 1986Feb 28, 1986Yes
00Apr 5, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50339015, documented in the API reference.