WELL · 42-503-39087 · DISTRICT 9
Wilkinson #1
Young County · Padgitt SW. (Miss) field · Vertical
Wilkinson #1 (API 42-503-39087) is a plugged well in Young County, plugged March 22, 1988, last operated by Hulsey-Ingram Oil Company.
The RRC has issued one drilling permit, issued December 11, 1985, permitted to 4,999 ft.
Completion filings report 3 formation tops, including Mclester Sand, Caddo, Mississippian.
Operator of record
Dallas, TX · P-5 Y, filed Apr 15, 1988 · 27 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hulsey-Ingram Oil Company |
| Production reports | none |
| Latest permit | Hulsey-Ingram Oil CompanyDec 11, 1985 |
- 4,999
- total depth, ft
- 1
- permits on file
- Dec 11, 1985
- last permit issued
- Feb 16, 1986
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 16, 1986
- Shut in
- —
- Plugged
- Mar 22, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 292447-99 | Drill | Hulsey-Ingram Oil Company | Mar 5, 1986 | Dec 11, 1985 | Dec 19, 1985 | 4,999 |
Formation tops
As filed on W-2/G-1. Subsea from 1,171 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| McLester Sand | 4,361 | -3,190 |
| CaddoCADDO LIME | 4,426 | -3,255 |
| MississippianMISSISSIPPIAN LIME | 4,680 | -3,509 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,361 | 4,378 | Perforated |
| 4,685 | 4,742 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 120 | 12.25 | 110 S |
| 4.5 | 4,700 | 7.875 | 175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 24, 1986 | Mar 4, 1986 | — |
| 00 | Mar 21, 1986 | Jan 31, 1986 | Yes |
| 00 | Mar 19, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-39087 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-39087 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50339087, documented in the API reference.