WELL · 42-503-39162 · DISTRICT 9
Donnell-Marston #1
Young County · Young County Regular field · Vertical
Donnell-Marston #1 (API 42-503-39162) is a plugged well in Young County, plugged September 18, 1997, last operated by Sta-Kel Incorporated.
The RRC has issued one drilling permit, issued February 3, 1986, permitted to 4,600 ft.
It was permitted by Donnell, Bill and has since transferred to Sta-Kel Incorporated on the wellbore schedule.
Completion filings report 3 formation tops, including Palo Pinto, Capps Lime, Caddo.
Its lease has reported 330 barrels of oil and 3.34K mcf of gas since January 1993, last reporting in November 1997.
Operator of record
Permitted by Donnell, Bill; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Dec 7, 2001
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sta-Kel Incorporated |
| Production reports | Sta-Kel Incorporatedthrough Jun 1997 |
| Latest permit | Donnell, BillFeb 3, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,600
- total depth, ft
- 1
- permits on file
- Feb 3, 1986
- last permit issued
- May 29, 1986
- completed
- 330
- cumulative oil, bbl
- 3.34K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 29, 1986
- Shut in
- —
- Plugged
- Sep 18, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Donnell-Marston O-13-26218 | Young County Regular | Sta-Kel Incorporated | 1 | 330 | 3.34K | Jan 1993 – Nov 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Donnell, BillJan 1993 → May 1995
- 2Harrell, CharlesJun 1995 → Oct 1996
- 3Sta-Kel IncorporatedJun 1997 → Jun 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 296929-99 | Drill | Donnell, Bill | Jan 31, 1986 | Feb 3, 1986 | Feb 13, 1986 | 4,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-26218 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,167 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo PintoPALO PINTO LIME | 1,385 | -218 |
| Capps Lime | 1,890 | -723 |
| CaddoCADDO LIME | 3,395 | -2,228 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,098 | 4,114 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 200 | 12.25 | 120 S |
| 4.5 | 4,306 | 7.875 | 165 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 2, 1986 | Jun 16, 1986 | Yes |
| 00 | Jun 24, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-39162 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-39162 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50339162, documented in the API reference.