WELL · 42-503-39190 · DISTRICT 13

Meredith #1

N

Young County  · Vertical

Meredith #1 (API 42-503-39190) is a former disposal or injection well in Young County, last operated by Lindsay Oil Operations; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 1986 and 1991, permitted to 4,999 ft.

Operator of record

Lindsay Oil Operations

Wichita Falls, TX · P-5 Y, filed Nov 5, 2010 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitLindsay Oil OperationsFeb 26, 1991
4,999
total depth, ft
2
permits on file
Feb 26, 1991
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
382343-99ReenterLindsay Oil OperationsDec 13, 1990Feb 26, 1991—900
299090-99DrillMurphy, James Jr., Inc.Mar 6, 1986Mar 6, 1986—4,999

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

925
bbl, last 12 reported months
925
bbl, all reported
Nov 1994
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082645W-14 DisposalCanceled Jun 1, 2000100335670–810

MONTHLY INJECTED, BBL · H-10 · LAST 1 REPORTED MONTHS

Last 12 months 925

05001K

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50339190, documented in the API reference.