WELL · 42-503-39280 · DISTRICT 9
Wells R. T. A #2
Young County · Padgitt SW. (Miss) field · Vertical
Wells R. T. A #2 (API 42-503-39280) is a plugged well in Young County, plugged February 7, 1995, last operated by Hulsey Oil Company.
The RRC has issued 2 drilling permits between 1986 and 1990, permitted to 4,999 ft.
Completion filings report 4 formation tops, including Caddo, Marble Falls, Barnett, Mississippian.
Its 2 leases have reported 2.06K barrels of oil and 21 mcf of gas since January 1993, last reporting in May 1995.
Operator of record
Dallas, TX · P-5 Y, filed Jan 7, 2000 · 7 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hulsey Oil Company |
| Production reports | Thornton, Michael D.through Sep 1994 |
| Latest permit | Hulsey Oil CompanyOct 11, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,999
- total depth, ft
- 2
- permits on file
- Oct 11, 1990
- last permit issued
- Jul 11, 1986
- completed
- 2.06K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 11, 1986
- Shut in
- —
- Plugged
- Feb 7, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wells, R.T. "A" O-13-27827 | Holbert (Conglomerate) | Thornton, Michael D. | 1 | 2.06K | 21 | Jan 1993 – May 1995 |
| — O-13-26278 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Thornton, Michael D.Jan 1993 → Aug 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 375210-99 | Recompletion | Hulsey Oil Company | Jul 5, 1990 | Oct 11, 1990 | — | 4,585 |
| 303215-99 | Drill | Hulsey-Ingram Oil Company | Jun 12, 1986 | Jun 12, 1986 | — | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-26278 | — | — | — | — |
| — | — O-13-27827 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,175 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 4,292 | -3,117 |
| Marble Falls | 4,480 | -3,305 |
| Barnett | 4,595 | -3,420 |
| MississippianMISSISSIPPI | 4,622 | -3,447 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,480 | 4,499 | Perforated |
| 4,622 | 4,640 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 126 | 12.25 | 100 S |
| 4.5 | 4,622 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 21, 1991 | Jun 8, 1990 | Yes |
| 00 | Nov 8, 1990 | Jul 28, 1986 | Yes |
| 00 | Aug 8, 1986 | Jul 28, 1986 | Yes |
| 00 | Aug 2, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-39280 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-39280 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50339280, documented in the API reference.