WELL · 42-503-39671 · DISTRICT 9
Atchison #1
Young County · Delong (Zone A) field · Vertical
Atchison #1 (API 42-503-39671) is a well in Young County operated by Britton Operating Inc., completed February 5, 1988.
The RRC has issued 2 drilling permits between 1987 and 1988, permitted to 4,400 ft.
Completion filings report 3 formation tops, including Caddo, Marble Falls, Mississippian.
Its lease has reported 31.1K barrels of oil and 12 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Aledo, TX · P-5 Y, filed Nov 2, 2018 · 146 permits on file · (817) 793-3227
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Britton Operating Inc. |
| Production reports | Safari Resources, LLCthrough Apr 2026 |
| Latest permit | Britton Operating, IncJul 13, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,400
- total depth, ft
- 2
- permits on file
- Jul 13, 1988
- last permit issued
- Feb 5, 1988
- completed
- 31.1K
- cumulative oil, bbl
- 12
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 5, 1988
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Atchison O-13-27119 | Ira-Lee (Mississippi) | Safari Resources, LLC | 1 | 31.1K | 12 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 839 · prior 12 229(+266%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Britton Operating, Inc.Jan 1993 → May 2017
- 2Safari Resources, LLCJul 2017 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 348700-99 | Recompletion | Britton Operating, Inc | Jul 11, 1988 | Jul 13, 1988 | — | 4,285 |
| 338894-99 | Drill | Britton Operating, Inc | Nov 16, 1987 | Nov 30, 1987 | — | 4,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-27119 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,107 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CaddoCADDO LIME | 3,443 | -2,336 |
| Marble Falls | 4,055 | -2,948 |
| MississippianMISS. | 4,285 | -3,178 |
| Mississippian | 4,285 | -3,178 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,282 | 4,285 | Perforated |
| 4,303 | 4,305 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 119 | 12.25 | 90 S |
| 4.5 | 4,310 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 30, 1988 | Jul 18, 1988 | Yes |
| 00 | Aug 5, 1988 | — | — |
| 00 | Mar 3, 1988 | Feb 18, 1988 | Yes |
| 00 | Mar 1, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-39671 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-39671 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50339671, documented in the API reference.