WELL · 42-503-39839 · DISTRICT 9

Haggard #1

Plugged

Young County · Wildcat field  · Vertical

Haggard #1 (API 42-503-39839) is a plugged well in Young County, plugged July 27, 1988, last operated by Kramer Frank C..

The RRC has issued one drilling permit, issued July 13, 1988, permitted to 4,999 ft.

It was permitted by Kramer, Frank C. and has since transferred to Kramer Frank C. on the wellbore schedule.

Operator of record

Kramer Frank C.

Permitted by Kramer, Frank C.; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitKramer, Frank C.Jul 13, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,999
total depth, ft
1
permits on file
Jul 13, 1988
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jul 27, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
348702-99DrillKramer, Frank C.Jul 11, 1988Jul 13, 1988—4,999

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50339839, documented in the API reference.