WELL · 42-503-39979 · DISTRICT 9

James (Caddo) Unit #26

Plugged

Young County · James field  · Vertical

James (Caddo) Unit #26 (API 42-503-39979) is a plugged well in Young County, plugged April 14, 2026, last operated by Merit Energy Company.

The RRC has issued one drilling permit (amended once), issued March 6, 1989, permitted to 4,999 ft.

It was permitted by Damson Oil Corp. and has since transferred to Merit Energy Company on the wellbore schedule.

Completion filings report one formation top, including Caddo.

Its 2 leases have reported 1.07M barrels of oil and 237K mcf of gas since January 1993, last reporting in July 2026. The leases carry 75 wells, so these are lease totals, not this well alone.

Operator of record

Merit Energy Company

Permitted by Damson Oil Corp.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Sep 4, 2025 · 1,049 permits on file · (972) 628-1559

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMerit Energy Company
Production reportsRidge Oil Companythrough Apr 2026
Latest permitThrockmorton Oil, Inc.Mar 6, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,999
total depth, ft
2
permits on file
Mar 6, 1989
last permit issued
Mar 27, 1989
completed
1.07M
cumulative oil, bbl
237K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 27, 1989
Shut in
—
Plugged
Apr 14, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 75 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
James (Caddo) Unit O-13-29232I.M.U. (Caddo Cons.)Ridge Oil Company38784K196KNov 1996 – Jul 2026
James (Caddo) Unit O-13-19056JamesMerit Energy Company37287K40.8KJan 1993 – Jan 1997

Oil, barrels lease total

Last 12 months 9,687 · prior 12 9,568(+1%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 1,230 · prior 12 4,418(-72%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Parker & Parsley Development Co.Jan 1993 → Dec 1994
  2. 2Merit Energy CompanyJan 1995 → Apr 2000
  3. 3Permian Resources, Inc.May 2000 → Apr 2004
  4. 4Chesapeake Operating, Inc.May 2004 → Mar 2010
  5. 5Chroma Operating, Inc.Apr 2010 → Nov 2014
  6. 6White Oak Operating Company LLCDec 2014 → Mar 2015
  7. 7Ridge Oil CompanyApr 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
356646-98DrillDamson Oil Corp.Apr 6, 1989Mar 6, 1989—4,200
356646-99DrillThrockmorton Oil, Inc.Mar 3, 1989Mar 6, 1989—4,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-19056————
—— O-13-29232————

Formation tops

As filed on W-2/G-1. Subsea from 1,136 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo3,810-2,674

Perforations

Perforated and open-hole intervals.

FromToType
3,8123,860Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62542712.25280 S
5.54,0637.875989 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 13, 1996Apr 20, 1989Yes
00May 5, 1989Apr 20, 1989Yes
00Apr 28, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50339979, documented in the API reference.