WELL · 42-503-40101 · DISTRICT 9

Shepard #6

Y

Young County · Young County Regular field · Producing  · Vertical

Shepard #6 (API 42-503-40101) is a well in Young County operated by Stewart Construction, completed January 4, 1990 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued November 29, 1989, permitted to 3,000 ft.

It was permitted by Hays & Boydston and has since transferred to Stewart Construction on the wellbore schedule.

Completion filings report one formation top, including Strawn.

Its lease has reported 30K barrels of oil and 661 mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Stewart Construction

Permitted by Hays & Boydston; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Mar 4, 2026 · 2 permits on file · (940) 438-2538

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStewart Construction
Production reportsStewart Constructionthrough Apr 2026
Latest permitHays & BoydstonNov 29, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,000
total depth, ft
1
permits on file
Nov 29, 1989
last permit issued
Jan 4, 1990
completed
30K
cumulative oil, bbl
661
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 4, 1990
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Shepard O-13-27625Young County RegularStewart Construction130K661Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 210 · prior 12 285(-26%)

02040202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hays, Boydston & MooreJan 1993 → Dec 1993
  2. 2Boydston & MooreJan 1994 → Dec 2002
  3. 3Bluebonnet Land & Cattle Co.Jan 2003 → Jun 2025
  4. 4Stewart ConstructionJul 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
366947-99DrillHays & BoydstonNov 27, 1989Nov 29, 1989—3,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-27625————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
StrawnUPPER STRAWN2,740

Perforations

Perforated and open-hole intervals.

FromToType
2,7402,750Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62540012.25200 S
4.53,0007.875125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 20, 1990Jan 12, 1990Yes
00Feb 22, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50340101, documented in the API reference.