WELL · 42-503-40107 · DISTRICT 9
Hennig #1
Young County · Camp Creek (Mississippi) field · Vertical
Hennig #1 (API 42-503-40107) is a plugged well in Young County, plugged August 25, 1995, last operated by Denoco Inc..
The RRC has issued one drilling permit, issued January 10, 1990, permitted to 4,999 ft.
It was permitted by New Era International and has since transferred to Denoco Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Caddo, Marble Falls, Mississippian.
Its lease has reported 273 barrels of oil and 26 mcf of gas since January 1993, last reporting in September 1995.
Operator of record
Permitted by New Era International; the EWA schedule now lists a different operator.
Plano, TX · P-5 Y, filed Apr 6, 2012 · 34 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Denoco Inc. |
| Production reports | Denoco Inc.through Aug 1995 |
| Latest permit | New Era InternationalJan 10, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,999
- total depth, ft
- 1
- permits on file
- Jan 10, 1990
- last permit issued
- Mar 21, 1990
- completed
- 273
- cumulative oil, bbl
- 26
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 21, 1990
- Shut in
- —
- Plugged
- Aug 25, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hennig O-13-27669 | Camp Creek (Mississippi) | Denoco Inc. | 1 | 273 | 26 | Jan 1993 – Sep 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1New Era InternationalJan 1993 → Jun 1993
- 2Denoco Inc.Jul 1993 → Aug 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 368170-99 | Drill | New Era International | Jan 2, 1990 | Jan 10, 1990 | — | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-27669 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,263 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 4,380 | -3,117 |
| Marble Falls | 4,766 | -3,503 |
| Mississippian | 4,910 | -3,647 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,910 | 4,914 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 180 | 12.25 | 140 S |
| 4.5 | 4,935 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 25, 1990 | Mar 30, 1990 | Yes |
| 00 | Apr 24, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-40107 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-40107 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50340107, documented in the API reference.