WELL · 42-503-40695 · DISTRICT 9

Chaney East #3427

N

Young County · Williamson field  · Vertical

Chaney East #3427 (API 42-503-40695) is a well in Young County operated by Ridge Oil Company, completed December 28, 1995.

The RRC has issued one drilling permit, issued November 3, 1995, permitted to 4,999 ft.

Completion filings report one formation top, including Caddo.

Its 3 leases have reported 4.17M barrels of oil and 138 mcf of gas since January 1996, last reporting in July 2026. The leases carry 172 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 163K barrels injected in the 12 months reported through November 2025.

Operator of record

Ridge Oil Company

Breckenridge, TX · P-5 Y, filed Jul 4, 2026 · 477 permits on file · (254) 559-0220

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRidge Oil Company
Production reportsRidge Oil Companythrough Apr 2026
Latest permitRidge Oil CompanyNov 3, 1995
4,999
total depth, ft
1
permits on file
Nov 3, 1995
last permit issued
Dec 28, 1995
completed
4.17M
cumulative oil, bbl
138
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 28, 1995
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 172 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Imu O-13-29703I.M.U. (Caddo Cons.)Ridge Oil Company1684.16M0Nov 1999 – Jul 2026
Chaney East O-13-29271I.M.U. (Caddo Cons.)Ridge Oil Company29.87K138Nov 1996 – Feb 2000
Chaney East O-13-29105WilliamsonRidge Oil Company22.44K0Jan 1996 – Mar 1997

Oil, barrels lease total

Last 12 months 84,708 · prior 12 91,023(-7%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ridge Oil CompanyJan 1996 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
441402-99DrillRidge Oil CompanyOct 30, 1995Nov 3, 1995Dec 11, 19954,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-29105————
—— O-13-29271————
—— O-13-29703————
—— O-13-29703————

Formation tops

As filed on W-2/G-1. Subsea from 1,098 ft elevation.Download CSV →

FormationMD ftSubsea
CaddoCADDO A3,778-2,680
CaddoCADDO B3,843-2,745
CaddoCADDO C3,882-2,784

Perforations

Perforated and open-hole intervals.

FromToType
3,7793,799Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62524412.25155 S
5.53,9887.875510 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 14, 2002Sep 18, 2002—
00Oct 7, 2002Mar 1, 1996Yes
00Dec 2, 1999Mar 1, 1996Yes
00Nov 13, 1996Mar 1, 1996Yes
00Apr 15, 1996Mar 1, 1996Yes
00Mar 14, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

163K
bbl, last 12 reported months
2.89M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000090043H-1 InjectionActive1,5001,8503,779–3,799

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 162,990 · prior 12 0

010K20K30K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50340695, documented in the API reference.