WELL · 42-503-40698 · DISTRICT 9

Nash-Daniel Unit #7

Plugged

Young County · Nash-Daniel (Mississippi Lime) field  · Horizontal

Nash-Daniel Unit #7 (API 42-503-40698) is a plugged horizontal well in Young County, plugged May 18, 2020, last operated by Romac Oil Company Inc..

The RRC has issued one drilling permit (amended twice), issued April 3, 1995, permitted to 4,900 ft.

It was permitted by Pennzoil Exploration & Prod. CO. and has since transferred to Romac Oil Company Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Caddo, Marble Falls, Barnett.

Its lease has reported 84.6K barrels of oil and 31.8K mcf of gas since January 1993, last reporting in June 2026. The lease carries 7 wells, so these are lease totals, not this well alone.

Operator of record

Romac Oil Company Inc.

Permitted by Pennzoil Exploration & Prod. Co.; the EWA schedule now lists a different operator.

Throckmorton, TX · P-5 Y, filed Jul 4, 2026 · 115 permits on file · (940) 521-4248

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRomac Oil Company Inc.
Production reportsRomac Oil Company, Inc.through Jul 2018
Latest permitPennzoil Exploration & Prod. Co.Apr 3, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,900
total depth, ft
3
permits on file
Apr 3, 1995
last permit issued
Jan 23, 1996
completed
84.6K
cumulative oil, bbl
31.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 23, 1996
Shut in
—
Plugged
May 18, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nash-Daniel Unit O-13-8099Nash-Daniel (Mississippi Lime)Romac Oil Company, Inc.784.6K31.8KJan 1993 – Jun 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pennzoil Petroleum CompanyJan 1993 → Jan 1995
  2. 2Pennzoil Exploration & Prod. Co.Feb 1995 → Dec 1998
  3. 3Romac Oil Company, Inc.Jan 1999 → Jul 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
434501-97DrillPennzoil Exploration & Prod. Co.Nov 20, 1995Apr 3, 1995Jan 14, 19964,900
434501-98DrillPennzoil Petroleum CompanyNov 7, 1995Apr 3, 1995—4,900
434501-99DrillPennzoil Petroleum CompanyApr 3, 1995Apr 3, 1995—4,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-8099————

Formation tops

As filed on W-2/G-1. Subsea from 1,160 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo3,612-2,452
Marble Falls4,207-3,047
BarnettBARNETT SHALE4,322-3,162

Perforations

Perforated and open-hole intervals.

FromToType
4,3614,367Perforated
4,3734,376Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62556011220 S
5.54,5507.875365 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 7, 1996Feb 13, 1996Yes
00Feb 26, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50340698, documented in the API reference.