WELL · 42-503-40762 · DISTRICT 9

Millis #1

N

Young County · Kendall (Mississippi Lime) field  · Vertical

Millis #1 (API 42-503-40762) is a well in Young County operated by Hill R.M. Operating Inc., completed July 22, 1996.

The RRC has issued one drilling permit, issued June 19, 1996, permitted to 5,000 ft.

Completion filings report 4 formation tops, including Palo Pinto, Village Bend, Caddo, Mississippian.

Its 2 leases have reported 12.1K barrels of oil and 105K mcf of gas since July 1996, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 237K barrels injected in the 12 months reported through November 2025.

Operator of record

Hill R.M. Operating Inc.

Graham, TX · P-5 Y, filed Jan 5, 2026 · 143 permits on file · (940) 550-4445

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHill R.M. Operating Inc.
Production reportsFour H Oil Propertiesthrough Jan 2012
Latest permitHill, R.M. Operating Inc.Jun 19, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
1
permits on file
Jun 19, 1996
last permit issued
Jul 22, 1996
completed
12.1K
cumulative oil, bbl
105K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 22, 1996
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Millis O-13-29211Kendall (Mississippi Lime)Boss Operating LLC112.1K92.9KOct 1996 – Jul 2026
Millis G-13-159842Kendall (Mississippi Lime)Hill, R.M. Operating Inc.1012.3KJul 1996 – Oct 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hill, R.M. Operating Inc.Jul 1996 → May 2000
  2. 2Four H Oil PropertiesSep 2000 → Jan 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
449301-99DrillHill, R.M. Operating Inc.Jun 14, 1996Jun 19, 1996Jun 25, 19965,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-159842————
—— O-13-29211————

Formation tops

As filed on W-2/G-1. Subsea from 1,194 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto1,500-306
Village Bend2,098-904
Caddo3,432-2,238
MississippianMISSISSIPPI4,400-3,206

Perforations

Perforated and open-hole intervals.

FromToType
4,4974,507Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62521612.25140 S
4.54,5077.875130 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 10, 2015Oct 21, 2015—
00Nov 1, 1996Oct 15, 1996—
00Oct 25, 1996——
00Oct 2, 1996Sep 12, 1996Yes
00Sep 26, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

237K
bbl, last 12 reported months
844K
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000107831H-1 InjectionActive1,0002,0004,497–4,507

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 237,260 · prior 12 221,197(+7%)

010K20K30K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50340762, documented in the API reference.