WELL · 42-503-40953 · DISTRICT 9

Stewart -A- #36

Y

Young County · Young County Regular field · Injection  · Vertical

Stewart -A- #36 (API 42-503-40953) is a well in Young County operated by W T X Capital Investments LLC, completed November 12, 2004 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued August 13, 1999, permitted to 700 ft.

It was permitted by Shanks, Bob and has since transferred to W T X Capital Investments LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Red Bed & Lime, Trinity Sand, Gunsight.

Its lease has reported 190K barrels of oil and 5 mcf of gas since January 1993, last reporting in July 2026. The lease carries 58 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 1.1K barrels injected in the 12 months reported through November 2025.

Operator of record

W T X Capital Investments LLC

Permitted by Shanks, Bob; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Dec 4, 2025 · 82 permits on file · (940) 642-0672

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleW T X Capital Investments LLC
Production reportsW T X Capital Investments, LLCthrough Mar 2026
Latest permitShanks, BobAug 13, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

700
total depth, ft
1
permits on file
Aug 13, 1999
last permit issued
Nov 12, 2004
completed
190K
cumulative oil, bbl
5
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 12, 2004
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 58 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stewart -A- O-13-7617Young County RegularW T X Capital Investments, LLC58190K5Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 2,755 · prior 12 2,408(+14%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Smith, Duane G. EngineeringJan 1993 → May 1993
  2. 2Shanks, BobOct 1995 → Feb 2001
  3. 3W T X Capital Investments, LLCMar 2001 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
486656-99DrillShanks, BobAug 13, 1999Aug 13, 1999Sep 11, 1999700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-7617————

Formation tops

As filed on W-2/G-1. Subsea from 1,071 ft elevation.Download CSV →

FormationMD ftSubsea
Red Bed & Lime11,070
Trinity Sand307764
GunsightGUNSIGHT SAND540531

Perforations

Perforated and open-hole intervals.

FromToType
544560Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.55776.7585 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 5, 2005Apr 11, 2005—
00May 4, 2000Apr 7, 2000Yes
00Apr 20, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.1K
bbl, last 12 reported months
33.7K
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000094460H-1 InjectionActive25260544–560

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,102 · prior 12 1,102(+0%)

05010020242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50340953, documented in the API reference.