WELL · 42-503-41073 · DISTRICT 9
Barnett #7
Young County · Barnett (Marble Falls Oil) field · Producing · Vertical
Barnett #7 (API 42-503-41073) is a well in Young County operated by Itx Corporation, completed April 4, 2001 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued February 27, 2001, permitted to 4,700 ft.
Completion filings report 5 formation tops, including Kma Lime, Capps Sand, Bryson, Caddo.
Its lease has reported 28.7K barrels of oil and 331K mcf of gas since December 1996, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Dallas, TX · P-5 Y, filed Jan 5, 2026 · 13 permits on file · (800) 880-1955
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Itx Corporation |
| Production reports | Itx Corporationthrough Apr 2026 |
| Latest permit | Itx CorporationFeb 27, 2001 |
- 4,700
- total depth, ft
- 1
- permits on file
- Feb 27, 2001
- last permit issued
- Apr 4, 2001
- completed
- 28.7K
- cumulative oil, bbl
- 331K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 4, 2001
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Barnett O-13-29289 | Barnett (Marble Falls, Oil) | Itx Corporation | 2 | 28.7K | 331K | Dec 1996 – Jul 2026 |
Gas, mcf lease total
Last 12 months 1,007 · prior 12 2,119(-52%)
Oil, barrels lease total
Last 12 months 307 · prior 12 320(-4%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Vandermeer Energy Corp.Dec 1996 → Nov 1998
- 2Itx CorporationDec 1998 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 505829-99 | Drill | Itx Corporation | Feb 27, 2001 | Feb 27, 2001 | Mar 5, 2001 | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-29289 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,258 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Kma Lime | 2,310 | -1,052 |
| Capps Sand | 2,495 | -1,237 |
| Bryson | 3,135 | -1,877 |
| Caddo | 4,135 | -2,877 |
| Marble Falls | 4,543 | -3,285 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,543 | 4,575 | Perforated |
| 4,592 | 4,607 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 432 | 12.25 | 250 S |
| 4.5 | 4,647 | 7.875 | 130 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 19, 2001 | Apr 20, 2001 | Yes |
| 00 | May 4, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-41073 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-41073 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50341073, documented in the API reference.