WELL · 42-503-41202 · DISTRICT 9
Hall J. F. #3 B
Young County · Wildcat field · Vertical
Hall J. F. #3 B (API 42-503-41202) is a permitted well in Young County filed by Barnett Energy, Inc.; no completion report is on file yet.
The RRC has issued one drilling permit, issued September 8, 2003, permitted to 4,900 ft.
Completion filings report 6 formation tops, including Glenna, Strawn, Caddo, Massive Caddo.
Its 2 leases have reported 8.75K barrels of oil and 41K mcf of gas since February 2004, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Graham, TX · P-5 Y, filed Aug 4, 2025 · 32 permits on file · (972) 249-7774
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Barnett Energy Inc. |
| Production reports | Barnett Energy, Inc.through Mar 2025 |
| Latest permit | Barnett Energy, Inc.Sep 8, 2003 |
- 4,900
- total depth, ft
- 1
- permits on file
- Sep 8, 2003
- last permit issued
- —
- completed
- 8.75K
- cumulative oil, bbl
- 41K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2004 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hall, J. F. O-13-30282 | Napeco (Miss) | Barnett Energy, Inc. | 2 | 8.75K | 41K | Feb 2004 – Jul 2026 |
| Hall, J. F. O-13-30295 | Wildcat | Barnett Energy, Inc. | 1 | 0 | 0 | Apr 2004 – Jul 2007 |
Oil, barrels lease total
Last 12 months 0 · prior 12 42(-100%)
Gas, mcf lease total
Last 12 months 0 · prior 12 16(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Barnett Energy, Inc.Feb 2004 → Mar 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 535987-99 | Drill | Barnett Energy, Inc. | Sep 2, 2003 | Sep 8, 2003 | Oct 22, 2003 | 4,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-30282 | — | — | — | — |
| — | — O-13-30295 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,310 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Glenna | 3,064 | -1,754 |
| Strawn | 3,388 | -2,078 |
| Caddo | 3,965 | -2,655 |
| Massive Caddo | 4,110 | -2,800 |
| Marble Falls | 4,392 | -3,082 |
| Mississippian | 4,800 | -3,490 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,800 | 4,803 | Perforated |
| 4,813 | 4,816 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 273 | 12.25 | 150 S |
| — | 3,550 | 7.875 | 170 S |
| 4.5 | 4,835 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 6, 2007 | May 14, 2007 | Yes |
| 00 | Jul 23, 2007 | Mar 1, 2004 | Yes |
| 00 | Jun 8, 2004 | Mar 1, 2004 | Yes |
| 00 | May 6, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-41202 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-41202 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50341202, documented in the API reference.