WELL · 42-503-41792 · DISTRICT 13

Hamlett #1W

Plugged

Young County  · Vertical

Hamlett #1W (API 42-503-41792) is a plugged well in Young County, plugged December 5, 2014, last operated by Bettis, Boyle & Stovall.

The RRC has issued 2 drilling permits between 2011 and 2014, permitted to 5,100 ft.

Operator of record

Bettis, Boyle & Stovall

Graham, TX · P-5 Y, filed Oct 7, 2022 · 530 permits on file · (940) 456-2143

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitBettis, Boyle & StovallNov 17, 2014
5,100
total depth, ft
2
permits on file
Nov 17, 2014
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Dec 5, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
800137-99ReenterBettis, Boyle & StovallNov 12, 2014Nov 17, 2014Nov 18, 20144,930
707657-99DrillBettis, Boyle & StovallDec 28, 2010Jan 7, 2011Apr 11, 20115,100

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2019
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000111136H-1 InjectionPlugged Dec 29, 20145001,0004,870–4,930

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120182019

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50341792, documented in the API reference.