WELL · 42-503-41807 · DISTRICT 9
Evans #1
Young County · Karran North (Marble Falls) field · Vertical
Evans #1 (API 42-503-41807) is a plugged well in Young County, plugged June 25, 2018, last operated by Gannett Operating LLC.
The RRC has issued one drilling permit, issued March 17, 2011, permitted to 5,000 ft.
It was permitted by Hill, R.M. Operating Inc. and has since transferred to Gannett Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Palo Pinto, Capps, Caddo.
Its lease has reported 1.43K barrels of oil and 32.2K mcf of gas since April 2011, last reporting in September 2018.
Operator of record
Permitted by Hill, R.M. Operating Inc.; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed May 4, 2026 · 21 permits on file · (940) 550-5351
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Gannett Operating LLC |
| Production reports | Gannett Operating LLCthrough Oct 2017 |
| Latest permit | Hill, R.M. Operating Inc.Mar 17, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 1
- permits on file
- Mar 17, 2011
- last permit issued
- Apr 20, 2011
- completed
- 1.43K
- cumulative oil, bbl
- 32.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2011 THROUGH Sep 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 20, 2011
- Shut in
- —
- Plugged
- Jun 25, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Evans O-13-32079 | Karran, North (Marble Falls) | Gannett Operating LLC | 1 | 1.43K | 32.2K | Apr 2011 – Sep 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hill, R.M. Operating Inc.May 2011 → Jul 2016
- 2Gannett Operating LLCAug 2016 → Oct 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 711794-99 | Drill | Hill, R.M. Operating Inc. | Mar 9, 2011 | Mar 17, 2011 | Mar 28, 2011 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-32079 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,053 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo PintoPALO PINTO LM | 1,382 | -329 |
| Capps | 1,922 | -869 |
| Caddo | 3,822 | -2,769 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,145 | 4,154 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 295 | 12.25 | 190 S |
| 4.5 | 4,590 | 7.875 | 205 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 27, 2012 | Aug 18, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-41807 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-41807 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50341807, documented in the API reference.