WELL · 42-503-84698 · DISTRICT 9

Killian #2L

Plugged

Young County · Dillard field  · Vertical

Killian #2L (API 42-503-84698) is a plugged well in Young County, plugged April 17, 1984, last operated by Landrum Petroleum CO. Inc..

The RRC has issued one drilling permit, issued September 13, 1982, permitted to 4,965 ft.

It was permitted by Landrum Operating CO., Inc. and has since transferred to Landrum Petroleum CO. Inc. on the wellbore schedule.

Operator of record

Landrum Petroleum Co. Inc.

Permitted by Landrum Operating Co., Inc.; the EWA schedule now lists a different operator.

Burkburnett, TX · P-5 Inactive, filed Jul 2, 1998 · 120 permits on file · (940) 569-2580

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLandrum Petroleum Co. Inc.
Production reportsnone
Latest permitLandrum Operating Co., Inc.Sep 13, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,965
total depth, ft
1
permits on file
Sep 13, 1982
last permit issued
Jul 19, 1982
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 19, 1982
Shut in
—
Plugged
Apr 17, 1984

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
171656-99OtherLandrum Operating Co., Inc.Sep 13, 1982Sep 13, 1982—4,965

Perforations

Perforated and open-hole intervals.

FromToType
4,9654,970Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.75156——
4.54,9956.75400 S
2.3754,995——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Sep 20, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

75.6K
bbl, last 12 reported months
75.6K
bbl, all reported
Jun 1983
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000044864H-1 InjectionPlugged Apr 26, 1984000–0

MONTHLY INJECTED, BBL · H-10 · LAST 4 REPORTED MONTHS

Last 12 months 75,649

020K40K

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50384698, documented in the API reference.