WELL · 42-503-85179 · DISTRICT 9

W-W Hog Farm #1

Plugged

Young County · Ed Bishop (Strawn) field  · Vertical

W-W Hog Farm #1 (API 42-503-85179) is a plugged well in Young County, plugged April 20, 1989, last operated by D & H Cementing Inc..

The RRC has issued one drilling permit, issued November 11, 1985, permitted to 3,200 ft.

It was permitted by AB-Mor Production Company and has since transferred to D & H Cementing Inc. on the wellbore schedule.

Operator of record

D & H Cementing Inc.

Permitted by AB-Mor Production Company; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Apr 7, 1995

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleD & H Cementing Inc.
Production reportsnone
Latest permitAB-Mor Production CompanyNov 11, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,200
total depth, ft
1
permits on file
Nov 11, 1985
last permit issued
Jul 15, 1987
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 15, 1987
Shut in
—
Plugged
Apr 20, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
290260-99OtherAB-Mor Production CompanyNov 13, 1985Nov 11, 1985—3,200

Perforations

Perforated and open-hole intervals.

FromToType
2,7232,727Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7510712.7585 S
4.53,4257.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 14, 1989Apr 7, 1989Yes
00Jul 18, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082377W-14 DisposalPlugged Jul 11, 19893,5001,3502,723–3,018

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50385179, documented in the API reference.