WELL · 42-503-85294 · DISTRICT 9

WP McMillion #2

Plugged

Young County  · Vertical

WP Mcmillion #2 (API 42-503-85294) is a plugged well in Young County, plugged November 26, 2019, last operated by WP Oil & Gas Exploration LLC.

The RRC has issued one drilling permit, issued March 27, 2014, permitted to 650 ft.

Operator of record

WP Oil & Gas Exploration LLC

Loving, TX · P-5 Y, filed Aug 4, 2025 · 16 permits on file · (940) 873-3333

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitWP Oil & Gas Exploration LLCMar 27, 2014
650
total depth, ft
1
permits on file
Mar 27, 2014
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Nov 26, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
780192-99ReenterWP Oil & Gas Exploration LLCFeb 19, 2014Mar 27, 2014Apr 10, 2014650

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000122076UIC PermitPlugged Dec 29, 198800519–529

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50385294, documented in the API reference.