WELL · 42-505-30170 · DISTRICT 4
Haynes #3
Zapata County · Haynes (Hinnant Cons.) field · Vertical
Haynes #3 (API 42-505-30170) is a plugged well in Zapata County, plugged November 7, 2013, last operated by Devon Energy Production CO L.P..
The RRC has issued 2 drilling permits between 1977 and 2011, permitted to 11,000 ft.
Completion filings report 3 formation tops, including W-12, W-13, A Sand.
Operator of record
Devon Energy Production Co L.P.
Oklahoma City, OK · P-5 Y, filed Nov 4, 2025 · 9,266 permits on file · (800) 465-8314
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Devon Energy Production Co L.P. |
| Production reports | Devon Energy Production Co, L.P.through May 2011 |
| Latest permit | Devon Energy Production Co, L.P.Apr 8, 2011 |
- 11,000
- total depth, ft
- 2
- permits on file
- Apr 8, 2011
- last permit issued
- Apr 26, 2011
- completed
- 0
- cumulative oil, bbl
- 12.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 26, 2011
- Shut in
- —
- Plugged
- Nov 7, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Haynes G-4-74554 | Comitas (Deep) | Devon Energy Production Co, L.P. | 1 | 0 | 11.1K | Jan 1993 – Nov 2013 |
| Haynes G-4-265440 | Haynes (Hinnant Cons.) | Devon Energy Production Co, L.P. | 1 | 0 | 1.34K | Apr 2011 – Nov 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pennzoil Exploration & Prod. Co.Jan 1993 → Sep 1995
- 2Devon Energy Production Co, L.P.Apr 2011 → May 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 713580-99 | Recompletion | Devon Energy Production Co, L.P. | Apr 5, 2011 | Apr 8, 2011 | Mar 24, 2011 | 10,678 |
| 11910-99 | Recompletion | Pennzoil Producing Co. | Nov 14, 1977 | Nov 14, 1977 | — | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-74554 | — | — | — | — |
| — | — G-4-265440 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 17 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| W-12 | 8,015 | -7,998 |
| W-13 | 8,219 | -8,202 |
| A Sand | 9,058 | -9,041 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,058 | 9,152 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 562 | 15 | 370 S |
| 7.625 | 6,265 | 9.875 | 800 S |
| 2.875 | 10,650 | 4.625 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 5, 2012 | Apr 13, 2012 | — |
| 00 | Jan 12, 1984 | Jan 3, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-30170 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-30170 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50530170, documented in the API reference.