WELL · 42-505-31275 · DISTRICT 4

Villarreal-Gutierrez Unit #1

N

Zapata County · Urebeno South (Lobo 6) field  · Vertical

Villarreal-Gutierrez Unit #1 (API 42-505-31275) is a well in Zapata County operated by Bfd Energy Corporation, completed August 12, 1989.

The RRC has issued 2 drilling permits between 1980 and 1993, permitted to 10,500 ft.

No lease production has been reported under this well’s leases.

Operator of record

BFD Energy Corporation

Georgetown, TX · P-5 Y, filed Feb 1, 2002 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBFD Energy Corporation
Production reportsSilver Fox Oil & Gas LLCthrough May 2023
Latest permitBFD Energy CorporationOct 26, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
2
permits on file
Oct 26, 1993
last permit issued
Aug 12, 1989
completed
0
cumulative oil, bbl
1.17M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 12, 1989
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Villarreal-Gutierrez Unit G-4-147543Urebeno, South (Lobo 3)Silver Fox Oil & Gas LLC101.13MOct 1993 – Jul 2026
Villarreal-Gutierrez Unit G-4-91756Urebeno, South (Lobo 6)BFD Energy Corporation1044.1KJan 1993 – Oct 1993

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BFD Energy CorporationJan 1993 → May 1998
  2. 2Mueller Exploration, Inc.Jun 1998 → Feb 2016
  3. 3Silver Fox Oil & Gas LLPJun 2017 → Apr 2020
  4. 4Silver Fox Oil & Gas LLCMay 2020 → May 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
417408-99RecompletionBFD Energy CorporationOct 22, 1993Oct 26, 1993Oct 19, 19938,700
92513-99DrillMobil Producing TX. & N.M. Inc.Sep 10, 1980Sep 10, 1980—10,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-91756————
—— G-4-147543————

Perforations

Perforated and open-hole intervals.

FromToType
8,6048,708Perforated
8,8718,875Perforated
8,8718,959Perforated
8,9048,913Perforated
8,9438,959Perforated
9,0429,054Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,015——
7.6256,190——
2.3758,801——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 29, 1998Dec 4, 1998—
00Mar 1, 1994Dec 28, 1993Yes
00Jan 3, 1994——
00Nov 9, 1989Oct 16, 1989—
00Jan 12, 1984Dec 12, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50531275, documented in the API reference.