WELL · 42-505-31718 · DISTRICT 4
Hinnant L. A. H et AL #1
Zapata County · Aviators South (11800) field · Vertical
Hinnant L. A. H ET AL #1 (API 42-505-31718) is a plugged well in Zapata County, plugged January 25, 1999, last operated by Hughes Dan A. Company.
The RRC has issued one drilling permit, issued September 8, 1983, permitted to 13,000 ft.
It was permitted by Hughes & Hughes and has since transferred to Hughes Dan A. Company on the wellbore schedule.
Completion filings report 4 formation tops, including Queen City, Wilcox, 1st Hinnant, 2nd Hinnant.
Operator of record
Permitted by Hughes & Hughes; the EWA schedule now lists a different operator.
Beeville, TX · P-5 Y, filed Nov 5, 2010 · 448 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hughes Dan A. Company |
| Production reports | Hughes, Dan A. Companythrough Jan 1999 |
| Latest permit | Hughes & HughesSep 8, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,000
- total depth, ft
- 1
- permits on file
- Sep 8, 1983
- last permit issued
- May 7, 1984
- completed
- 0
- cumulative oil, bbl
- 535K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 7, 1984
- Shut in
- —
- Plugged
- Jan 25, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hinnant, L. A. "H" et AL G-4-110954 | Aviators, South (11800) | Hughes, Dan A. Company | 1 | 0 | 535K | Jan 1993 – Jan 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hughes, Dan A. CompanyJan 1993 → Jan 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 210415-99 | Drill | Hughes & Hughes | Aug 30, 1983 | Sep 8, 1983 | Oct 21, 1983 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-110954 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 849 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen City | 6,370 | -5,521 |
| Wilcox | 8,607 | -7,758 |
| Wilcox1ST WILCOX | 8,935 | -8,086 |
| 1ST Hinnant | 9,250 | -8,401 |
| Wilcox3RD WILCOX | 9,610 | -8,761 |
| 2ND Hinnant | 9,940 | -9,091 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,653 | 11,662 | Perforated |
| 11,696 | 11,710 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,715 | 17.5 | 2,150 S |
| 9.625 | 8,330 | 12.25 | 935 S |
| 4.5 | 12,519 | 6.75 | 540 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 2, 1989 | Dec 23, 1988 | — |
| 00 | Aug 29, 1985 | Aug 9, 1985 | — |
| 00 | Jul 10, 1984 | May 18, 1984 | — |
| 00 | Jun 30, 1984 | May 18, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-31718 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-31718 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.