WELL · 42-505-31751 · DISTRICT 4
Ramirez Oscar #Q1
Zapata County · Lopeno ( Queen City H 1) field · Vertical
Ramirez Oscar #Q1 (API 42-505-31751) is a plugged well in Zapata County, plugged February 24, 1999, last operated by Mustang Oil & Gas Corporation.
The RRC has issued one drilling permit, issued January 27, 1984, permitted to 2,650 ft.
It was permitted by Gulf Energy Producing Company and has since transferred to Mustang Oil & Gas Corporation on the wellbore schedule.
Completion filings report one formation top, including Queen City.
Operator of record
Permitted by Gulf Energy Producing Company; the EWA schedule now lists a different operator.
Wichita Falls, TX · P-5 Y, filed Apr 4, 2003 · 34 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mustang Oil & Gas Corporation |
| Production reports | Mustang Oil & Gas Corporationthrough May 1998 |
| Latest permit | Gulf Energy Producing CompanyJan 27, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,650
- total depth, ft
- 1
- permits on file
- Jan 27, 1984
- last permit issued
- Jan 30, 1984
- completed
- 0
- cumulative oil, bbl
- 35.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 30, 1984
- Shut in
- —
- Plugged
- Feb 24, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ramirez, Oscar G-4-111158 | Lopeno ( Queen City H 1) | Mustang Oil & Gas Corporation | 1 | 0 | 35.8K | Jan 1993 – Feb 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Holden Energy CorporationJan 1993 → Jul 1993
- 2BPL Exploration, Ltd.Aug 1993 → Dec 1993
- 3Mustang Oil & Gas CorporationJan 1994 → May 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 228271-99 | Drill | Gulf Energy Producing Company | Dec 19, 1983 | Jan 27, 1984 | — | 2,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-111158 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 323 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen City | 2,117 | -1,794 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,484 | 2,500 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 523 | 12.25 | 270 sx |
| 5.5 | 2,654 | 7.875 | 200 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 5, 1984 | Jun 20, 1984 | — |
| 00 | Jul 3, 1984 | Jun 20, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-31751 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-31751 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50531751, documented in the API reference.