WELL · 42-505-31774 · DISTRICT 4
Guerra, Avelino #2A
Zapata County · Vertical
Guerra, Avelino #2A (API 42-505-31774) is a permitted well in Zapata County filed by Dominion Expl. & Prod., Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1984 and 2000, permitted to 15,050 ft.
Completion filings report 2 formation tops, including "E" Sand, Ramos Sand.
Operator of record
Houston, TX · P-5 Y, filed Dec 5, 2008 · 271 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Vantage Operating II, LLCthrough Apr 2026 |
| Latest permit | Dominion Expl. & Prod., Inc.Jul 19, 2000 |
- 15,050
- total depth, ft
- 2
- permits on file
- Jul 19, 2000
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.07M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Guerra, Avelino G-4-117458 | Lopeno (Wilcox 9,600) | Vantage Operating II, LLC | 1 | 0 | 1.07M | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 759 · prior 12 2,164(-65%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Graham Royalty, Ltd.Jan 1993 → Oct 1993
- 2Midpar L.P.Nov 1993 → Feb 1995
- 3Parker & Parsley Development L.PMar 1995 → Oct 1996
- 4XTO Energy Inc.Sep 2007 → Jun 2021
- 5Vantage Operating II, LLCJul 2021 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 497344-99 | Recompletion | Dominion Expl. & Prod., Inc. | Jul 19, 2000 | Jul 19, 2000 | — | 12,000 |
| 233474-99 | Drill | Gulf Energy Producing Company | Apr 25, 1985 | Mar 16, 1984 | Sep 17, 1984 | 15,050 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-117458 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 346 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| "E" Sand | 9,146 | -8,800 |
| Ramos Sand | 10,086 | -9,740 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,148 | 9,168 | Perforated |
| 9,192 | 9,210 | Perforated |
| 10,084 | 10,110 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 667 | — | 545 S |
| 20 | 667 | 26 | 1,490 S |
| 13.375 | 5,950 | 17.5 | 1,850 S |
| 4.5 | 9,480 | 9.625 | 546 S |
| 9.625 | 10,627 | 12.25 | 2,400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 19, 2008 | Dec 19, 2007 | — |
| 00 | Oct 23, 2007 | Sep 4, 2007 | — |
| 00 | Feb 13, 1989 | Dec 23, 1988 | — |
| 00 | Aug 20, 1985 | Jul 22, 1985 | — |
| 00 | Aug 9, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-31774 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-31774 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50531774, documented in the API reference.