WELL · 42-505-32063 · DISTRICT 4

Muzza G. P. #7

Y

Zapata County · Fandango (Wilcox Consolidated) field · Temp Abandoned  · Vertical

Muzza G. P. #7 (API 42-505-32063) is a well in Zapata County operated by NI Energy LLC, completed September 26, 2003 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued April 26, 1985, permitted to 15,500 ft.

It was permitted by Shell Western E&P Inc. and has since transferred to NI Energy LLC on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

No lease production has been reported under this well’s leases.

Operator of record

NI Energy LLC

Permitted by Shell Western E&P Inc.; the EWA schedule now lists a different operator.

Portland, TX · P-5 Y, filed Jan 16, 2026 · (361) 815-5688

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNI Energy LLC
Production reportsShell Western E&Pthrough Feb 2006
Latest permitShell Western E&P Inc.Apr 26, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,500
total depth, ft
1
permits on file
Apr 26, 1985
last permit issued
Sep 26, 2003
completed
0
cumulative oil, bbl
713K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 26, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Muzza, G. P. G-4-124110Fandango (Wilcox, Upper T2-T3)NI Energy LLC10713KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&P Inc.Jan 1993 → Jan 1997
  2. 2Shell Western E&PSep 2003 → Feb 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
273454-99DrillShell Western E&P Inc.Apr 25, 1985Apr 26, 1985Jun 10, 198515,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-124110————

Formation tops

As filed on W-2/G-1. Subsea from 598 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxWILCOX UPPER R13,740-13,142
WilcoxWILCOX, UPPER R13,740-13,142
WilcoxWILCOX UPPER S14,305-13,707
WilcoxWILCOX, UPPER S14,305-13,707
WilcoxWILCOX UPPER T14,575-13,977
WilcoxWILCOX, UPPER T14,575-13,977
WilcoxWILCOX UPPER T214,691-14,093
WilcoxWILCOX, UPPER T214,691-14,093
WilcoxWILCOX UPPER T314,930-14,332
WilcoxWILCOX, UPPER T314,930-14,332

Perforations

Perforated and open-hole intervals.

FromToType
13,76013,780Perforated
14,30814,322Perforated
14,71214,732Perforated
14,75414,778Perforated
14,79614,832Perforated
14,93414,922Perforated
14,93414,972Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
161,22520900 S
11.758,45814.752,500 S
11.758,45914.752,500 S
2.87513,8515.5120 S
5.515,0648.51,340 S
5.515,0808.51,340 S
515,0808.51,340 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 12, 2003Oct 6, 2003Yes
00Dec 12, 1995Oct 23, 1995—
00Nov 9, 1994Sep 21, 1994—
00May 29, 1992May 22, 1992—
00Jun 9, 1987May 8, 1987Yes
00May 28, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50532063, documented in the API reference.