WELL · 42-505-32121 · DISTRICT 4

Guerra M #2

N

Zapata County · Roleta (Wilcox Consolidated) field  · Vertical

Guerra M #2 (API 42-505-32121) is a well in Zapata County operated by Peoples Energy Prod.-TX L.P., completed July 28, 2001.

The RRC has issued 2 drilling permits (amended once) between 1985 and 2006, permitted to 10,500 ft.

Completion filings report 4 formation tops, including Queen City, Wilcox, Top Of 7483 Sand, Top Of 8150 Sand.

No lease production has been reported under this well’s leases.

Operator of record

Peoples Energy Prod.-TX L.P.

Houston, TX · P-5 Y, filed Feb 3, 2012 · 272 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePeoples Energy Prod.-TX L.P.
Production reportsMerit Energy Companythrough Feb 2022
Latest permitPeoples Energy Prod.-TX, L.P.Aug 25, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
3
permits on file
Aug 25, 2006
last permit issued
Jul 28, 2001
completed
0
cumulative oil, bbl
712K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 28, 2001
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Guerra "M" G-4-223053Roleta (7483)Merit Energy Company10107KSep 2006 – Jul 2026
Guerra "M" G-4-119384Roleta (Wilcox Consolidated)Peoples Energy Prod.-TX, L.P.10604KJan 1993 – Jun 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bridge Oil Production Co., Inc.Jan 1993 → Jun 1993
  2. 2Bridge Oil Company, L. P.Jul 1993 → Sep 1994
  3. 3Parker & Parsley Development L.POct 1994 → Jan 1995
  4. 4Parker & Parsley Producing L.P.Feb 1995 → Oct 1997
  5. 5Pioneer Resources Producing, L.PNov 1997 → Feb 1999
  6. 6Prize Operating CompanyNov 1999 → Mar 2002
  7. 7Gruy Petroleum Management Co.Apr 2002 → Nov 2002
  8. 8Peoples Energy Prod.-TX, L.P.Dec 2002 → Sep 2007
  9. 9Coronado Energy E&P Company, LLCOct 2007 → Dec 2010
  10. 10EL Paso E & P Company, L. P.Jan 2011 → Jul 2012
  11. 11EP Energy E&P Company, L.P.Aug 2012 → Oct 2013
  12. 12Cantera Operating, LLCNov 2013 → Nov 2017
  13. 13Merit Energy CompanyDec 2017 → Feb 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
624924-99RecompletionPeoples Energy Prod.-TX, L.P.Aug 24, 2006Aug 25, 2006—10,115
283691-98Field transferBridge Oil Company, L. P.Sep 28, 1993Aug 27, 1985—10,115
283691-99DrillTXO Production Corp.Aug 26, 1985Aug 27, 1985Oct 28, 198510,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-119384————
—— G-4-223053————

Formation tops

As filed on W-2/G-1. Subsea from 333 ft elevation.Download CSV →

FormationMD ftSubsea
Queen CityTOP OF QUEEN CITY2,230-1,897
Queen City2,330-1,997
WilcoxTOP OF WILCOX5,594-5,261
Wilcox5,594-5,261
Top of 7483 Sand8,007-7,674
Top of 8150 Sand8,152-7,819

Perforations

Perforated and open-hole intervals.

FromToType
8,0068,028Perforated
8,0408,044Perforated
8,7958,807Perforated
8,7958,836Perforated
8,8148,822Perforated
8,8318,838Perforated
9,4039,442Perforated
9,6579,702Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,02912.25160 S
77,1948.75412 S
4.510,1026313 S
4.510,102—313 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 4, 2007Nov 16, 2006Yes
00Dec 11, 2006——
00Oct 10, 2001Aug 24, 2001—
00Jan 19, 1994Dec 1, 1993—
00Nov 4, 1993Oct 11, 1993—
00Jul 7, 1993May 6, 1993—
00Nov 9, 1989Sep 19, 1989—
00Jan 15, 1986Dec 17, 1985Yes
00Jan 10, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50532121, documented in the API reference.