WELL · 42-505-32169 · DISTRICT 4

Kramer #1

Plugged

Zapata County · Roleta (Wilcox Consolidated) field  · Vertical

Kramer #1 (API 42-505-32169) is a plugged well in Zapata County, plugged March 29, 2000, last operated by West Energy Developers Inc..

The RRC has issued one drilling permit, issued February 5, 1986, permitted to 9,800 ft.

It was permitted by Spg Exploration, Corp. and has since transferred to West Energy Developers Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Queen City, Reklaw, Wilcox.

Operator of record

West Energy Developers Inc.

Permitted by SPG Exploration, Corp.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Jun 4, 2026 · 3 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWest Energy Developers Inc.
Production reportsWest Energy Developers, Inc.through Dec 1994
Latest permitSPG Exploration, Corp.Feb 5, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,800
total depth, ft
1
permits on file
Feb 5, 1986
last permit issued
Apr 16, 1986
completed
0
cumulative oil, bbl
22.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2000

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 16, 1986
Shut in
—
Plugged
Mar 29, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kramer G-4-120832Roleta (Wilcox Consolidated)West Energy Developers, Inc.1022.7KJan 1993 – Mar 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amax Oil & Gas Inc.Jan 1993 → Apr 1993
  2. 2West Energy Developers, Inc.Jul 1994 → Dec 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
297590-99DrillSPG Exploration, Corp.Feb 4, 1986Feb 5, 1986Feb 22, 19869,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-120832————

Formation tops

As filed on W-2/G-1. Subsea from 356 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City2,200-1,844
Reklaw4,133-3,777
WilcoxUPPER WILCOX5,495-5,139
WilcoxMIDDLE WILCOX6,195-5,839
WilcoxLOWER WILCOX7,335-6,979

Perforations

Perforated and open-hole intervals.

FromToType
8,7958,806Perforated
8,9818,999Perforated
9,1509,156Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7551814.75375 S
7.6257,0419.875700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 8, 1986Apr 25, 1986Yes
00May 2, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50532169, documented in the API reference.