WELL · 42-505-32176 · DISTRICT 4
Alexander #3
Zapata County · Roleta (8150) field · Vertical
Alexander #3 (API 42-505-32176) is a well in Zapata County operated by Amax Oil & Gas Inc., completed June 29, 1986.
The RRC has issued 2 drilling permits between 1986 and 1993, permitted to 10,500 ft.
Completion filings report 3 formation tops, including Queen City, Reklaw, Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
Fort Worth, TX · P-5 Y, filed Sep 5, 2003 · 302 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Amax Oil & Gas Inc. |
| Production reports | Union Pacific Resources Companythrough Oct 1995 |
| Latest permit | Amax Oil & Gas Inc.Aug 25, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,500
- total depth, ft
- 2
- permits on file
- Aug 25, 1993
- last permit issued
- Jun 29, 1986
- completed
- 0
- cumulative oil, bbl
- 21.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 29, 1986
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Alexander G-4-146454 | Roleta (7483) | Ineos USA Oil & Gas LLC | 1 | 0 | 21.9K | Jul 1993 – Jul 2026 |
| Alexander G-4-121794 | Roleta (8150) | Amax Oil & Gas Inc. | 1 | 0 | 0 | Jan 1993 – Dec 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Amax Oil & Gas Inc.Aug 1993 → Mar 1994
- 2Union Pacific Resources CompanyApr 1994 → Oct 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 415270-99 | Recompletion | Amax Oil & Gas Inc. | Aug 23, 1993 | Aug 25, 1993 | Jun 30, 1993 | 8,600 |
| 299148-99 | Drill | SPG Exploration, Corp. | Jul 10, 1986 | Mar 7, 1986 | May 8, 1986 | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-121794 | — | — | — | — |
| — | — G-4-146454 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 353 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen City | 2,393 | -2,040 |
| Reklaw | 4,065 | -3,712 |
| WilcoxUPPER WILCOX | 5,243 | -4,890 |
| WilcoxMIDDLE WILCOX | 5,712 | -5,359 |
| WilcoxLOWER WILCOX | 6,855 | -6,502 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,224 | 8,260 | Perforated |
| 8,754 | 8,772 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 507 | 14.75 | 375 S |
| 7.625 | 7,047 | 9.875 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 15, 1993 | Sep 8, 1993 | Yes |
| 00 | Sep 13, 1993 | — | — |
| 00 | Aug 18, 1986 | Jul 16, 1986 | Yes |
| 00 | Aug 8, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-32176 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-32176 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50532176, documented in the API reference.