WELL · 42-505-32251 · DISTRICT 4

Garza Lauro #E 4

Y

Zapata County · Haynes (Hinnant Cons.) field · Producing  · Vertical

Garza Lauro #E 4 (API 42-505-32251) is a well in Zapata County operated by Hilcorp Energy Company, completed August 5, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued October 17, 1986, permitted to 13,500 ft.

It was permitted by Pennzoil Producing CO. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including Mirando, Crockett, Queen City, Basil Queen City.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Pennzoil Producing Co.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitPennzoil Producing Co.Oct 17, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,500
total depth, ft
2
permits on file
Oct 17, 1986
last permit issued
Aug 5, 2010
completed
0
cumulative oil, bbl
790K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 5, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garza, Lauro G-4-123373Haynes (Hinnant Cons.)Hilcorp Energy Company10790KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 219 · prior 12 121(+81%)

02040202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pennzoil Exploration & Prod. Co.Jan 1993 → Feb 1999
  2. 2Pennzenergy Exp. & Prod., L.L.C.Mar 1999 → Mar 2000
  3. 3Devon Energy Production Co, L.P.Apr 2000 → Jun 2002
  4. 4Merit Energy CompanyJul 2002 → Aug 2007
  5. 5Synergy Oil & Gas, L.P.Nov 2007 → Apr 2010
  6. 6Denali Oil & Gas Management, LLCJun 2010 → Sep 2012
  7. 7Argent Energy (US) Holdings Inc.Oct 2012 → May 2016
  8. 8BXP Operating, LLCFeb 2017 → Nov 2021
  9. 9Hilcorp Energy CompanyDec 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
321884-98DrillPennzoil Producing Co.Oct 23, 1986Oct 17, 1986—13,500
321884-99DrillPennzoil Producing Co.Oct 15, 1986Oct 17, 1986—13,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-123373————

Formation tops

As filed on W-2/G-1. Subsea from 444 ft elevation.Download CSV →

FormationMD ftSubsea
Mirando1,430-986
Crockett3,850-3,406
Queen City4,730-4,286
Basil Queen City6,210-5,766
1170011,750-11,306
Crockett——
Mirando——
Queen City——

Perforations

Perforated and open-hole intervals.

FromToType
11,07711,085Perforated
11,34111,353Perforated
11,76911,779Perforated
11,78311,803Perforated
11,80811,812Perforated
11,825—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37563517.5625 S
9.6258,40012.251,710 S
2.87512,9908.51,530 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 24, 2010Sep 21, 2010—
00Mar 12, 1987Feb 12, 1987Yes
00Mar 7, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50532251, documented in the API reference.