WELL · 42-505-32327 · DISTRICT 4
Alexander et AL #1
Zapata County · Directional
Alexander ET AL #1 (API 42-505-32327) is a permitted well in Zapata County filed by Eog Resources, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1987 and 1999, permitted to 14,000 ft.
Completion filings report 3 formation tops, including Queen City, Reklaw, Wilcox.
Operator of record
Midland, TX · P-5 Y, filed Jul 4, 2026 · 16,348 permits on file · (713) 594-5431
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | EOG Resources, Inc.through Oct 1999 |
| Latest permit | EOG Resources, Inc.Oct 19, 1999 |
- 14,000
- total depth, ft
- 2
- permits on file
- Oct 19, 1999
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 975K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Alexander et AL G-4-126302 | Tigre Grande (12000) | EOG Resources, Inc. | 1 | 0 | 975K | Jan 1993 – Apr 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Burk Royalty CompanyJan 1993 → Mar 1996
- 2Enron Oil & Gas CompanyApr 1996 → Sep 1999
- 3EOG Resources, Inc.Oct 1999 → Oct 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 488660-99 | Recompletion | EOG Resources, Inc. | Oct 19, 1999 | Oct 19, 1999 | — | 14,000 |
| 330396-99 | Drill | Petropool, Inc. | May 18, 1987 | May 20, 1987 | — | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-126302 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 341 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen City | 2,365 | -2,024 |
| ReklawREKLAW B | 4,890 | -4,549 |
| Wilcox | 6,780 | -6,439 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,523 | 12,551 | Perforated |
| 12,966 | 12,974 | Perforated |
| 12,966 | 13,142 | Perforated |
| 12,977 | 12,985 | Perforated |
| 12,992 | 12,998 | Perforated |
| 13,016 | 13,030 | Perforated |
| 13,044 | 13,054 | Perforated |
| 13,062 | 13,066 | Perforated |
| 13,072 | 13,078 | Perforated |
| 13,100 | 13,104 | Perforated |
| 13,236 | 13,242 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 812 | 17.5 | 680 S |
| 7 | 6,500 | 6.5 | 140 S |
| 9.625 | 6,798 | 12.25 | 784 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 31, 1996 | Jun 10, 1996 | — |
| 00 | Mar 21, 1988 | Feb 29, 1988 | Yes |
| 00 | Feb 19, 1988 | Jan 27, 1988 | Yes |
| 00 | Feb 11, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-32327 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-32327 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50532327, documented in the API reference.