WELL · 42-505-32566 · DISTRICT 4

Vela - Smith Gas Unit #3

N

Zapata County · Roleta (8150) field  · Vertical

Vela - Smith Gas Unit #3 (API 42-505-32566) is a well in Zapata County operated by Bridge Oil Production CO. Inc., completed September 11, 1989.

The RRC has issued 2 drilling permits between 1989 and 1992, permitted to 10,500 ft.

Completion filings report 4 formation tops, including 7483 Sand, Top Of 7483 Sand, 8150 Sand, Top Of 8150 Sand.

No lease production has been reported under this well’s leases.

Operator of record

Bridge Oil Production Co. Inc.

Midland, TX · P-5 Y, filed May 7, 1993 · 97 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBridge Oil Production Co. Inc.
Production reportsMerit Energy Companythrough Apr 2026
Latest permitBridge Oil Production Co., Inc.Oct 29, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
2
permits on file
Oct 29, 1992
last permit issued
Sep 11, 1989
completed
0
cumulative oil, bbl
835K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 11, 1989
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vela "B" G-4-142898Roleta (7483)Merit Energy Company10835KJan 1993 – Jul 2026
— G-4-132036——000—

Gas, mcf lease total

Last 12 months 191 · prior 12 267(-28%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bridge Oil Production Co., Inc.Jan 1993 → Jun 1993
  2. 2Bridge Oil Company, L. P.Jul 1993 → Sep 1994
  3. 3Parker & Parsley Development L.POct 1994 → Jan 1995
  4. 4Parker & Parsley Producing L.P.Feb 1995 → Oct 1997
  5. 5Pioneer Resources Producing, L.PNov 1997 → Jun 1999
  6. 6Prize Operating CompanyJul 1999 → Mar 2002
  7. 7Gruy Petroleum Management Co.Apr 2002 → Nov 2002
  8. 8Peoples Energy Prod.-TX, L.P.Dec 2002 → Sep 2007
  9. 9Coronado Energy E&P Company, LLCOct 2007 → Oct 2010
  10. 10EL Paso E & P Company, L. P.Jan 2011 → Jul 2012
  11. 11EP Energy E&P Company, L.P.Aug 2012 → Oct 2013
  12. 12Cantera Operating, LLCNov 2013 → Nov 2017
  13. 13Merit Energy CompanyDec 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
404921-99RecompletionBridge Oil Production Co., Inc.Oct 19, 1992Oct 29, 1992Oct 8, 19928,800
360453-99DrillTXO Production Corp.Jun 15, 1989Jun 16, 1989—10,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-132036————
—— G-4-142898————

Formation tops

As filed on W-2/G-1. Subsea from 339 ft elevation.Download CSV →

FormationMD ftSubsea
7483 Sand7,450-7,111
Top of 7483 Sand7,450-7,111
8150 Sand8,240-7,901
Top of 8150 Sand8,240-7,901

Perforations

Perforated and open-hole intervals.

FromToType
7,5617,564Perforated
7,5677,572Perforated
7,5747,588Perforated
7,5927,596Perforated
9,4989,510Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,25017.5710 S
9.6257,36112.25485 S
2.87510,0008.51,050 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 15, 1993Nov 12, 1992Yes
00Nov 17, 1992——
00Nov 13, 1989Oct 2, 1989Yes
00Oct 10, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50532566, documented in the API reference.