WELL · 42-505-32838 · DISTRICT 4

Molletes Creek a GU #1

Plugged

Zapata County · Urebeno South (Wilcox 7000) field  · Vertical

Molletes Creek A GU #1 (API 42-505-32838) is a plugged well in Zapata County, plugged November 3, 2023, last operated by Shidler Mark L. Inc..

The RRC has issued 2 drilling permits between 1991 and 1996, permitted to 10,500 ft.

It was permitted by Enron Oil & Gas Company and has since transferred to Shidler Mark L. Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Wilcox, Navarro.

Operator of record

Shidler Mark L. Inc.

Permitted by Enron Oil & Gas Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jul 4, 2026 · 6 permits on file · (713) 252-7746

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleShidler Mark L. Inc.
Production reportsShidler, Mark L., Inc.through Apr 2021
Latest permitEnron Oil & Gas CompanyFeb 9, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
2
permits on file
Feb 9, 1996
last permit issued
Feb 16, 1996
completed
0
cumulative oil, bbl
1.12M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 16, 1996
Shut in
—
Plugged
Nov 3, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Molletes Creek "a" G.U. G-4-145105Urebeno, South (Lobo 6)Shidler, Mark L., Inc.10119KJan 1993 – Jul 2026
Molletes Creek "a" GU G-4-157128Urebeno, South (Wilcox 7000)Shidler, Mark L., Inc.101MFeb 1996 – Apr 2025

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyMay 1993 → Dec 1997
  2. 2Atasca Resources, Inc.Jan 1998 → Apr 1999
  3. 3Okie Operating Company, Ltd.May 1999 → Jan 2000
  4. 4L & R Energy CorporationFeb 2000 → Dec 2001
  5. 5Silver Pines Energy Corp.Jan 2002 → Sep 2006
  6. 6Shidler, Mark L., Inc.Oct 2006 → Apr 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
444672-99RecompletionEnron Oil & Gas CompanyFeb 9, 1996Feb 9, 1996Feb 12, 19969,500
393850-99DrillEnron Oil & Gas CompanyNov 12, 1991Nov 12, 1991Dec 29, 199110,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-145105————
—— G-4-157128————

Formation tops

As filed on W-2/G-1. Subsea from 343 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox2,970-2,627
WilcoxLOWER WILCOX4,442-4,099
Navarro9,170-8,827

Perforations

Perforated and open-hole intervals.

FromToType
7,1247,136Perforated
7,1367,154Perforated
8,3368,408Perforated
8,3368,408Open hole
9,1739,242Perforated
9,1739,294Perforated
9,2709,294Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,00012.25345 S
75,9958.75400 S
2.8759,4916.25550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 29, 1996——
00Mar 27, 1996Mar 1, 1996Yes
00Mar 11, 1996——
00Jul 6, 1993May 11, 1993—
00May 28, 1993Apr 28, 1993Yes
00May 13, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50532838, documented in the API reference.