WELL · 42-505-32984 · DISTRICT 4

Rathmell J. G. #2

Y

Zapata County · Hundido (Lobo) field · Producing  · Vertical

Rathmell J. G. #2 (API 42-505-32984) is a well in Zapata County operated by Merit Energy Company, completed March 14, 1993 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 15, 1992, permitted to 11,700 ft.

It was permitted by Conoco Inc. and has since transferred to Merit Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including Queen City, Carrizo, 9300' Sand, Lobo Unconformity.

No lease production has been reported under this well’s leases.

Operator of record

Merit Energy Company

Permitted by Conoco Inc.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Sep 4, 2025 · 1,049 permits on file · (972) 628-1559

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMerit Energy Company
Production reportsMerit Energy Companythrough Apr 2026
Latest permitConoco Inc.Dec 15, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,700
total depth, ft
1
permits on file
Dec 15, 1992
last permit issued
Mar 14, 1993
completed
0
cumulative oil, bbl
1.15M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 14, 1993
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rathmell, J. G. G-4-144553Hundido (Lobo)Merit Energy Company101.15MMar 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 1,917 · prior 12 1,398(+37%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conoco Inc.Mar 1993 → Jan 1996
  2. 2North Central Oil Corp.Jul 1999 → Dec 2005
  3. 3Pogo Producing CompanyJan 2006 → Jan 2008
  4. 4Pogo Producing Company LLCFeb 2008 → Aug 2011
  5. 5Plains Exploration & Prod. Co.Sep 2011 → Feb 2012
  6. 6OXY USA Inc.Mar 2012 → Apr 2017
  7. 7Merit Energy CompanyMay 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
407267-99DrillConoco Inc.Dec 15, 1992Dec 15, 1992Dec 30, 199211,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-144553————

Formation tops

As filed on W-2/G-1. Subsea from 522 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City2,407-1,885
CarrizoCARRIZO WILCOX4,940-4,418
9300' Sand9,357-8,835
Lobo Unconformity9,698-9,176
Wills Point10,470-9,948

Perforations

Perforated and open-hole intervals.

FromToType
9,8049,814Perforated
9,8349,848Perforated
9,8639,875Perforated
10,07810,100Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62553312.25225 S
77,4228.75235 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 12, 1993Mar 25, 1993Yes
00Apr 2, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000088687W-14 DisposalNot activated5,0001,4252,850–4,350

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50532984, documented in the API reference.