WELL · 42-505-33001 · DISTRICT 4
Smith AH #6
Zapata County · Roleta (7483) field · Vertical
Smith AH #6 (API 42-505-33001) is a well in Zapata County operated by Peoples Energy Prod.-TX L.P., completed March 18, 2001.
The RRC has issued 3 drilling permits between 1993 and 2003, permitted to 9,200 ft.
Completion filings report 4 formation tops, including 7483' Wilcox, Top Of 7483 Wilcox, Roleta (7483), Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
Houston, TX · P-5 Y, filed Feb 3, 2012 · 272 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Peoples Energy Prod.-TX L.P. |
| Production reports | Merit Energy Companythrough Jul 2022 |
| Latest permit | Peoples Energy Prod.-TX, L.P.Jul 29, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,200
- total depth, ft
- 3
- permits on file
- Jul 29, 2003
- last permit issued
- Mar 18, 2001
- completed
- 0
- cumulative oil, bbl
- 1.3M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 18, 2001
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Vela-Smith G. U. G-4-144371 | Roleta (Wilcox Consolidated) | Merit Energy Company | 1 | 0 | 1.26M | Mar 1993 – Jul 2026 |
| Smith 'AH" G-4-181988 | Roleta (7483) | Peoples Energy Prod.-TX, L.P. | 1 | 0 | 42.1K | Mar 2001 – Dec 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bridge Oil Production Co., Inc.Mar 1993 → Jun 1993
- 2Bridge Oil Company, L. P.Jul 1993 → Sep 1994
- 3Parker & Parsley Development L.POct 1994 → Jan 1995
- 4Parker & Parsley Producing L.P.Feb 1995 → Oct 1997
- 5Pioneer Resources Producing, L.PNov 1997 → Jun 1999
- 6Prize Operating CompanyJul 1999 → Mar 2002
- 7Gruy Petroleum Management Co.Apr 2002 → Nov 2002
- 8Peoples Energy Prod.-TX, L.P.Dec 2002 → Sep 2007
- 9Coronado Energy E&P Company, LLCOct 2007 → Dec 2010
- 10EL Paso E & P Company, L. P.Jan 2011 → Jul 2012
- 11EP Energy E&P Company, L.P.Aug 2012 → Oct 2013
- 12Cantera Operating, LLCNov 2013 → Nov 2017
- 13Merit Energy CompanyDec 2017 → Jul 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 534748-99 | Recompletion | Peoples Energy Prod.-TX, L.P. | Jul 29, 2003 | Jul 29, 2003 | Aug 19, 2003 | 8,500 |
| 504777-99 | Recompletion | Prize Operating Company | Jan 31, 2001 | Jan 31, 2001 | Feb 22, 2001 | 7,500 |
| 408235-99 | Drill | Bridge Oil Production Co., Inc. | Jan 19, 1993 | Jan 20, 1993 | Jan 21, 1993 | 9,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-144371 | — | — | — | — |
| — | — G-4-181988 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 330 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,380 | 7,406 | Perforated |
| 8,310 | 8,314 | Perforated |
| 8,310 | 8,328 | Perforated |
| 8,316 | 8,328 | Perforated |
| 8,447 | 8,454 | Perforated |
| 8,447 | 8,464 | Perforated |
| 8,455 | 8,464 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,045 | 12.25 | 325 S |
| 7 | 7,300 | 8.5 | 541 S |
| 7 | 7,300 | 8.75 | 541 S |
| 7 | 7,300 | — | 541 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 8, 2004 | Nov 10, 2003 | Yes |
| 00 | Jun 21, 2001 | Apr 6, 2001 | — |
| 00 | May 1, 2001 | — | — |
| 00 | Apr 29, 1993 | Mar 15, 1993 | Yes |
| 00 | Mar 23, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-33001 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-33001 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50533001, documented in the API reference.