WELL · 42-505-33046 · DISTRICT 4

Haynes Mineral Trust #14

Y

Zapata County · Haynes (Middle Wilcox Cons.) field · Shut IN-Multi-Compl  · Vertical

Haynes Mineral Trust #14 (API 42-505-33046) is a well in Zapata County operated by Hilcorp Energy Company, completed January 20, 1994 and listed as shut in-multi-compl on the RRC schedule.

The RRC has issued 2 drilling permits in 1993, permitted to 14,500 ft.

It was permitted by Transamerican Natural Gas Corp. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including T/Wilcox, Wilcox, B/Wilcox, Wills Point.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Transamerican Natural Gas Corp.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitTransamerican Natural Gas Corp.Dec 28, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,500
total depth, ft
2
permits on file
Dec 28, 1993
last permit issued
Jan 20, 1994
completed
0
cumulative oil, bbl
1.01M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 20, 1994
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Haynes Mineral Trust G-4-146891Munoz (Lobo)Hilcorp Energy Company10668KSep 1993 – Jul 2026
Haynes Mineral Trust G-4-148682Haynes (Middle Wilcox Cons.)Hilcorp Energy Company10345KJan 1994 – Jul 2026

Gas, mcf lease total

Last 12 months 6,357 · prior 12 4,955(+28%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Transamerican Natural Gas Corp.Sep 1993 → May 1997
  2. 2Conoco Inc.Jun 1997 → Dec 2001
  3. 3Houston Exploration Company, TheJan 2002 → Jun 2007
  4. 4Forest Oil CorporationJul 2007 → Dec 2012
  5. 5Hilcorp Energy CompanyJan 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
419697-99RecompletionTransamerican Natural Gas Corp.Dec 28, 1993Dec 28, 1993Dec 14, 199314,500
412006-99DrillTransamerican Natural Gas Corp.May 21, 1993May 21, 1993Jun 14, 199314,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-146891————
—— G-4-148682————

Formation tops

As filed on W-2/G-1. Subsea from 380 ft elevation.Download CSV →

FormationMD ftSubsea
T/Wilcox6,810-6,430
Wilcox6,810-6,430
B/Wilcox9,800-9,420
Wills Point14,240-13,860

Perforations

Perforated and open-hole intervals.

FromToType
10,57811,296Perforated
13,99014,158Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7575014.75530 S
79,8068.75340 S
4.514,3756.125480 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 28, 1994Mar 18, 1994—
00May 13, 1994Feb 14, 1994Yes
00May 3, 1994Feb 14, 1994Yes
00Apr 8, 1994——
00Dec 6, 1993Oct 22, 1993Yes
00Oct 27, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533046, documented in the API reference.