WELL · 42-505-33178 · DISTRICT 4
Yzaguirre, D. Heirs #1
Zapata County · Directional
Yzaguirre, D. Heirs #1 (API 42-505-33178) is a permitted well in Zapata County filed by Transtexas Gas Corporation; no completion report is on file yet.
The RRC has issued 2 drilling permits (amended once) between 1993 and 1994, permitted to 15,000 ft.
Completion filings report 2 formation tops, including Wilcox, Top L-1.
Operator of record
Dallas, TX · P-5 Y, filed May 6, 2005 · 925 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Beehive Operating, LLCthrough Apr 2026 |
| Latest permit | Transtexas Gas CorporationApr 1, 1994 |
- 15,000
- total depth, ft
- 3
- permits on file
- Apr 1, 1994
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.23M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1995 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Yzaguirre, D. Heirs G-4-156675 | Bob West (L-18, 20, 21, 22) | Beehive Operating, LLC | 1 | 0 | 1.23M | Mar 1995 – Jul 2026 |
Gas, mcf lease total
Last 12 months 2,081 · prior 12 2,093(-1%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Transtexas Gas CorporationMar 1995 → Oct 2001
- 2EL Paso Production Oil & Gas Co.Nov 2001 → Jul 2006
- 3EL Paso E & P Company, L. P.Aug 2006 → Feb 2008
- 4Smith Production Inc.Mar 2008 → Apr 2008
- 5Crimson Exploration Oper., Inc.May 2008 → Jan 2017
- 6Beehive Operating, LLCFeb 2017 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 422629-98 | Drill | Transtexas Gas Corporation | Aug 2, 1995 | Apr 1, 1994 | — | 15,000 |
| 422629-99 | Drill | Transtexas Gas Corporation | Apr 1, 1994 | Apr 1, 1994 | Apr 9, 1994 | 15,000 |
| 416593-99 | Drill | Rio Grande Drilling Company | Sep 30, 1993 | Oct 6, 1993 | — | 12,670 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-156675 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 316 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| WilcoxWILCOX MARKER | 5,435 | -5,119 |
| Top L-1 | 8,150 | -7,834 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,814 | 12,246 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 786 | 12.25 | 350 S |
| 7 | 7,896 | 8.75 | 265 S |
| 4.5 | 13,645 | 6.125 | 770 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 4, 1996 | Apr 6, 1995 | Yes |
| 00 | Jan 29, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-33178 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-33178 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50533178, documented in the API reference.