WELL · 42-505-33274 · DISTRICT 4
Perez F. R. #3
Zapata County · Bob West North (12 900) field · Directional · Sidetrack
Perez F. R. #3 (API 42-505-33274) is a well in Zapata County operated by Transtexas Gas Corporation, completed July 2, 1996.
The RRC has issued 2 drilling permits (amended once) between 1994 and 1996, permitted to 15,000 ft.
Completion filings report 7 formation tops, including Recklaw, Top Of Recklaw, L-1, Top Of L-1.
No lease production has been reported under this well’s leases.
Operator of record
Dallas, TX · P-5 Y, filed May 6, 2005 · 925 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Transtexas Gas Corporation |
| Production reports | Beehive Operating, LLCthrough Sep 2021 |
| Latest permit | Transtexas Gas CorporationJul 18, 1996 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 15,000
- total depth, ft
- 3
- permits on file
- Jul 18, 1996
- last permit issued
- Jul 2, 1996
- completed
- 0
- cumulative oil, bbl
- 489K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1995 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 2, 1996
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Perez, F. R. G-4-156510 | Bob West, North (L2, L3) | Beehive Operating, LLC | 1 | 0 | 412K | Aug 1995 – Jul 2026 |
| Perez, F. R. G-4-159593 | Bob West, North (12,900) | Transtexas Gas Corporation | 1 | 0 | 77.3K | Jul 1996 – Jun 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Transtexas Gas CorporationAug 1995 → Oct 2001
- 2EL Paso Production Oil & Gas Co.Nov 2001 → Jul 2006
- 3EL Paso E & P Company, L. P.Aug 2006 → Feb 2008
- 4Smith Production Inc.Mar 2008 → Apr 2008
- 5Crimson Exploration Oper., Inc.May 2008 → Jan 2017
- 6Beehive Operating, LLCFeb 2017 → Sep 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 450533-99 | Recompletion · sidetrack | Transtexas Gas Corporation | Jul 18, 1996 | Jul 18, 1996 | Jun 16, 1996 | 15,000 |
| 430808-98 | Drill · sidetrack | Transtexas Gas Corporation | Feb 9, 1995 | Dec 9, 1994 | Dec 11, 1994 | 15,000 |
| 430808-99 | Drill | Transtexas Gas Corporation | Dec 9, 1994 | Dec 9, 1994 | — | 15,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-156510 | — | — | — | — |
| — | — G-4-159593 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 325 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Recklaw | 3,700 | -3,375 |
| Top of Recklaw | 3,700 | -3,375 |
| L-1 | 7,850 | -7,525 |
| Top of L-1 | 7,850 | -7,525 |
| L-24 | 11,250 | -10,925 |
| Top of L-24 | 11,250 | -10,925 |
| Top of LO-1 7850 | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,970 | 7,278 | Perforated |
| 7,970 | 8,278 | Perforated |
| 13,116 | 13,694 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 775 | 12.25 | 350 S |
| 7 | 7,260 | 8.75 | 270 S |
| 4.5 | 14,000 | 6.125 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 17, 1999 | Jul 14, 1999 | — |
| 00 | Oct 30, 1996 | Aug 5, 1996 | Yes |
| 00 | Oct 11, 1996 | Aug 5, 1996 | Yes |
| 00 | Sep 3, 1996 | — | — |
| 00 | Mar 4, 1996 | Sep 7, 1995 | Yes |
| 00 | Jan 9, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-33274 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-33274 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50533274, documented in the API reference.