WELL · 42-505-33797 · DISTRICT 4

Jennings #35WD

N

Zapata County  · Vertical

Jennings #35WD (API 42-505-33797) is a former disposal or injection well in Zapata County, last operated by Pennzoil Exploration & Prod. CO.; its UIC permit is no longer active.

The RRC has issued one drilling permit (amended once), issued April 22, 1998, permitted to 5,500 ft.

Operator of record

Pennzoil Exploration & Prod. Co.

Carthage, TX · P-5 Y, filed Mar 22, 2001 · 1,023 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitPennzoil Exploration & Prod. Co.Apr 22, 1998
5,500
total depth, ft
2
permits on file
Apr 22, 1998
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
475527-98DrillPennzoil Exploration & Prod. Co.Aug 11, 1998Apr 22, 1998—5,500
475527-99DrillPennzoil Exploration & Prod. Co.Apr 22, 1998Apr 22, 1998—5,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Aug 2004
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000088239H-1 InjectionCanceled Jan 9, 20133,0001,9003,875–5,170

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120032004

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533797, documented in the API reference.