WELL · 42-505-33952 · DISTRICT 4
Texaco Fee #1
Zapata County · Zwebb (10350) field · Vertical
Texaco Fee #1 (API 42-505-33952) is a plugged well in Zapata County, plugged November 22, 2016, last operated by Eog Resources Inc..
The RRC has issued one drilling permit, issued June 11, 1999, permitted to 12,200 ft.
It was permitted by Enron Oil & Gas Company and has since transferred to Eog Resources Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Yegua, Queen City, Wilcox.
Operator of record
Permitted by Enron Oil & Gas Company; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Jul 4, 2026 · 16,348 permits on file · (713) 594-5431
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EOG Resources Inc. |
| Production reports | EOG Resources, Inc.through Jun 2011 |
| Latest permit | Enron Oil & Gas CompanyJun 11, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,200
- total depth, ft
- 1
- permits on file
- Jun 11, 1999
- last permit issued
- Aug 2, 1999
- completed
- 0
- cumulative oil, bbl
- 591K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1999 THROUGH Nov 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 2, 1999
- Shut in
- —
- Plugged
- Nov 22, 2016
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Texaco Fee G-4-174050 | Zwebb (10350) | EOG Resources, Inc. | 1 | 0 | 591K | Aug 1999 – Nov 2016 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Enron Oil & Gas CompanyAug 1999 → Sep 1999
- 2EOG Resources, Inc.Oct 1999 → Jun 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 485156-99 | Drill | Enron Oil & Gas Company | Jun 11, 1999 | Jun 11, 1999 | Jun 20, 1999 | 12,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-174050 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 594 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yegua | 2,122 | -1,528 |
| Queen CityTOP QUEEN CITY | 4,018 | -3,424 |
| Wilcox | 6,688 | -6,094 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,363 | 10,370 | Perforated |
| 10,372 | 10,391 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,034 | 12.25 | 355 S |
| 7 | 8,825 | 8.75 | 350 S |
| 2.875 | 11,199 | 6.125 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 20, 1999 | Sep 2, 1999 | Yes |
| 00 | Sep 8, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-33952 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-33952 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50533952, documented in the API reference.